Evidence for spatial variation of the fine structure constant

                                                    J. K. Webb1 , J. A. King1 , M. T. Murphy2 , V. V. Flambaum1 , R. F. Carswell3 , and M. B. Bainbridge1
                                                                  1
                                                                      School of Physics, University of New South Wales, Sydney, NSW 2052, Australia
                                                                  2
                                                                      Centre for Astrophysics and Supercomputing, Swinburne University of Technology,
                                                                                    Mail H39, PO Box 218, Victoria 3122, Australia and
                                                                        3
                                                                          Institute of Astronomy, Madingley Road, Cambridge, CB3 0HA, England.
                                                                                                  (Dated: August 25, 2010)
                                                              We previously reported observations of quasar spectra from the Keck telescope suggesting a
                                                           smaller value of the fine structure constant, α, at high redshift. A new sample of 153 measurements
                                                           from the ESO Very Large Telescope (VLT), probing a different direction in the universe, also depends
                                                           on redshift, but in the opposite sense, that is, α appears on average to be larger in the past. The
                                                           combined dataset is well represented by a spatial dipole, significant at the 4.1σ level, in the direction
arXiv:1008.3907v1 [astro-ph.CO] 23 Aug 2010




                                                           right ascension 17.3 ± 0.6 hours, declination −61 ± 9 degrees. A detailed analysis for systematics,
                                                           using observations duplicated at both telescopes, reveals none which are likely to emulate this result.

                                                           PACS numbers: 06.20.Jr, 95.30.Dr, 95.30.Sf, 98.62.Ra, 98.80.-k, 98.80.Es, 98.80.Jk


                                                 Quasar spectroscopy as a test of fundamental                     more extensive sky coverage. The ESO midas pipeline
                                              physics.— The vast light-travel times to distant quasars            was used for the first data reduction step, including wave-
                                              allows us to probe physics at high redshift. The rela-              length calibration, although enhancements were made to
                                              tive positions of wavenumbers, ωz , of atomic transitions           derive a more robust and accurate wavelength solution
                                              detected at redshift z = λobs /λlab − 1, can be com-                from an improved selection of thorium-argon calibration
                                              pared with laboratory values, ω0 , via the relationship             lamp emission lines [10]. Echelle spectral orders from sev-
                                                                2     2    2
                                              ωz = ω0 + Q αz − α0 /α0 and the coefficient Q mea-                    eral exposures of a given quasar were combined using
                                              sures the sensitivity of a given transition to a change in          uves popler [11]. A total of 60 quasar spectra from the
                                              α. The variation in both magnitude and sign of Q for dif-           VLT have been used for the present work, yielding 153
                                              ferent transitions is a significant advantage of the Many            absorption systems. Absorption systems were identified
                                              Multiplet method [1, 2], helping to combat potential sys-           via a careful visual search of each spectrum, using rd-
                                              tematics.                                                           gen [12], scanning for commonly detected transitions at
                                                 The first application of this method, 30 measurements             the same redshift, hence aligned in velocity coordinates.
                                              of ∆α/α = (αz − α0 ) /α0 , signalled a smaller α at high            Several transition matches were required for acceptance
                                              redshift at the 3σ significance level. By 2004 we had made           and, given the high spectral resolution, chance matches
                                              143 measurements of α covering a wide redshift range,               were eliminated.
                                              using further data from the Keck telescope obtained by                 Absorption system modelling.— As in our previous
                                              3 separate groups, supporting our earlier findings, that             studies, vpfit was used to model the profiles in each ab-
                                              towards that general direction in the universe at least, α          sorption system [13] with some enhancements, described
                                              may have been smaller at high redshift, at the 5σ level [3–         in [8]. A comprehensive list of the transitions used, their
                                              5]. The constant factor at that point was (undesirably)             laboratory wavelengths, oscillator strengths, and Q coef-
                                              the telescope/instrument.                                           ficients are compiled in [4, 8].
                                                Subsequently, only 1 further independent statistical                 The following general procedures were adhered to: (i)
                                              study has been completed [6], but difficulties with the               For each absorption system, physically related parame-
                                              analysis methods mean those results do not add to or                ters (redshifts and b-parameters) are tied, in order to
                                              provide a check on our earlier results [7]. A small num-            minimise the required number of free parameters and
                                              ber of individual α measurements have been made, but                derive the strongest possible constraints on line posi-
                                              provide no general conclusions since the systematic com-            tions, and hence ∆α/α. (ii) Parameters were tied only
                                              ponent of the error on ∆α/α ∼ 10−5 .                                for species with similar ionisation potentials, to min-
                                                 New data from the VLT.— We have now analysed                     imise possible introduction of random effects on α, mim-
                                              a large dataset from a different observatory, the VLT.               icked by spatial (and hence velocity) segregation effects;
                                              Full details and searches for systematic errors will be             (iii) Line broadening is typically dominated by turbulent
                                              given elsewhere[8, 9]. Here we summarize the evidence               rather than thermal motion. Both limiting-case models
                                              for spatial variation in α emerging from the combined               were applied and ∆α/α determined for each. The final
                                              Keck+VLT samples. Quasar spectra, obtained from the                 ∆α/α was derived from a likelihood-weighted average.
                                              ESO Science Archive, were selected, prioritising primar-            Details and justification are given in [8]; (iv) Where ap-
                                              ily by expected signal to noise but with some preference            propriate (and where available), isotopic structures are
                                              given to higher redshift objects and to objects giving              included in the fitting procedure (for Mgi, Mgii, Aliii,
2

Siii, and Feii); (v) Velocity structures were determined       and hence, on average, observe different directions on the
initially choosing the strongest unsaturated transitions       sky. We are thus motivated to explore a simple spatial
in each system. Normalised residuals across each tran-         dependence using the combined dataset.
sition fitted were examined and the fit progressively re-           The Keck sample we use is as presented in [5] with a
fined with the introduction of each additional transition       minor modification: 3 points were removed. 2 had been
to the fit; (vi) Transitions falling in spectral regions con-   included erroneously (from a spectrum known to have
taminated by telluric features or atmospheric absorption       calibration problems) and 1 further point was clipped,
were discarded. Any data regions contaminated by cos-          having a residual greater than 3σ against a modified LTS
mic rays, faulty CCD pixels, or any other unidentified          fit to the Keck data.
noise effects, were also discarded; (vii) A few gravita-           Initially the 3 datasets (i.e. Keck, VLT and combined)
tional lenses were identified by being difficult or impos-        are fitted using a simple possible dipole+monopole
sible to model successfuly. The non-point source quasar        model, represented here by ∆α/α = A cos Θ+m, where m
image and the resultant complex line-of-sight geometry         is a constant allowing an offset from the terrestrial value,
can significantly alter apparent relative line strengths.       Θ is the angle on the sky between quasar sightline and
These systems were discarded; (viii) In all cases we de-       best-fit dipole position, and A is the dipole amplitude.
rived the final model without solving for ∆α/α. The                To examine the probability of the observed dipole
introduction of ∆α/α as an additional free parameter           model arising by chance, we bootstrap the sample, re-
was only done once the profile velocity structure had           peatedly randomising the association between ∆α/α and
been finalised, eliminating any possible bias towards a         quasar sightline, fitting ∆α/α = A cos Θ + m at each re-
‘preferred’ ∆α/α. One potential consequence of this ap-        alisation. We then numerically determine the probability
proach might conceivably be a small bias on ∆α/α to-           of obtaining a value of χ2 less than or equal to the actual
wards zero, should some ‘fitting-away’ of ∆α/α occur, by        value by comparing with the χ2 probability distribution
column density adjustments or velocity structure deci-         from the bootstrap process.
sions. The reverse is not true, i.e. it cannot bias towards       Figure 1 illustrates the best-fit dipole equatorial co-
a non-zero ∆α/α.                                               ordinates on an all-sky map, with approximate 1σ error
   vpfit [13] minimises χ2 simultaneously over all species.    contours derived from the covariance matrix. Figure 2
Whilst the strongest components may appear in all              illustrates the ∆α/α binned data and the best-fit dipole
species, weaker components can sometimes fall below the        model. Best-fit parameters are given in the captions.
detection threshold and hence are excluded, such that             As a second trial model, allowing for a spatial gradient
a component which appears in MgII, for example, does           in α, we assign a distance to each ∆α/α measurement
not appear in FeII. There is no solution to this (known)       of r(z) = ct(z) where c is the speed of light and t(z)
problem but its effect merely adds an additional random         is the look-back time at redshift z. The model is then
scatter on ∆α/α for an ensemble of observations.               ∆α/α = Br(z) cos Θ + m. Figure 3 illustrates ∆α/α
   Spatially dependent α.— An initial inspection of ∆α/α       vs look-back time distance projected onto the dipole
vs redshift for the new VLT dataset reveals a redshift         axis, r cos Θ, using the best-fit dipole parameters for this
trend, opposite in sign compared to the earlier Keck           model. This model seems to represent the data reason-
data. Splitting each sample at z = 1.8, our 2004 Keck          ably well and the data show a strong correlation, signifi-
sample [5] gave ∆α/α z<1.8 = −0.54 ± 0.12 × 10−5 and           cant at the 4.1σ level.
 ∆α/α z>1.8 = −0.74 ± 0.17 × 10−5 . The present 2010              Given the relatively low statistical significance of the
VLT sample, which will be discussed in detail in [8] gives     monopole term m for both models above (see captions,
 ∆α/α z<1.8 = −0.06 ± 0.16 × 10−5 and ∆α/α z>1.8 =             Figures 2 and 3), and because the theoretical interpre-
+0.61 ± 0.20 × 10−5 . Errors here and throughout this          tation of a monopole term is unclear, a third model was
paper are 1σ estimates.                                        fitted, ∆α/α = Br cos Θ, giving B = 1.10 ± 0.25 × 10−6
   Errors on individual ∆α/α values for the VLT sample         GLyr−1 with a significance of 4.2σ and giving parame-
      2      2     2             2
are σtot = σstat +σsys , where σsys was derived empirically    ters right ascension 17.4 ± 0.6 hours, declination −58 ± 6
using a modification of the Least Trimmed Squares (LTS)         degrees.
method, where only 85% of data, those points with the             An alternative to empirically increasing the ∆α/α er-
smallest squared residuals, are fitted. σsys was assumed        ror bars to incorporate a systematic component is to as-
constant for all VLT absorbers and was found to be ≈                    2      2
                                                               sume σtot = σstat and to iteratively trim the data during
0.88 × 10−5 , showing that the scatter in the VLT ∆α/α         model fitting. This provides a further stringent test of
is greater than expected on the basis of statistical-errors    whether the apparent gradient in α is dominated by a
alone. Errors on ∆α/α for the Keck sample are discussed        subset of the data, perhaps more prone to some unknown
in [4], although we derive a new estimate of σsys for the                                                      2       2
                                                               systematic than the remainder. Adopting σtot = σstat
Keck points using the LTS method.                              will clearly result in higher significance levels. In Figure
   The Keck (Mauna Kea, Hawaii) and VLT (Paranal,              4 we plot the statistical significance of the dipole in units
Chile) locations on Earth are separated by 45◦ in latitude     of σ and find that over 40% of the data must be discarded
3




FIG. 1. All-sky plot showing the independent Keck (green)
and VLT (blue) best-fit dipoles, and the combined sample
(red), in equatorial co-ordinates. Approximate 1σ confidence
contours are from the covariance matrix. A bootstrap anal-         FIG. 3. ∆α/α vs Br cos Θ for the model ∆α/α = Br cos Θ +
ysis gives the chance-probability of getting the observed (or      m showing the gradient in α along the best-fit dipole. The
better) alignment between the independent Keck and VLT             best-fit direction is at right ascension 17.4±0.6 hours, declina-
dipoles is only 4%. The cosmic microwave background dipole         tion −62±6 degrees, for which B = (1.1±0.2)×10−6 GLyr−1
and antipole are illustrated for comparison.                       and m = (−1.9 ± 0.8) × 10−6 . This dipole+monopole model
                                                                   is statistically preferred over a monopole-only model also at
                                                                   the 4.1σ level. A cosmology with parameters (H0 , ΩM , ΩΛ ) =
                                                                   (70.5, 0.2736, 0.726) was used [14].




                                                                   FIG. 4. As an alternative to increasing ∆α/α error bars, to
                                                                   account for the additional scatter in the data as described in
                                                                                                2      2
FIG. 2. ∆α/α for the combined Keck and VLT data vs angle           the text, we instead use σtot = σstat and iteratively clip the
Θ from best-fit dipole, ∆α/α = A cos Θ + m, A = (0.97 ±             most deviant ∆α/α value, fitting ∆α/α = A cos Θ + m. The
0.21) × 10−5 and m = (−0.18 ± 0.08) × 10−5 . Dashed lines          vertical dashed line illustrates where the dotted curve χ2 = 1,
                                                                                                                            ν
illustrate ±1σ errors on the dipole fit. The best-fit dipole is at   when ∼ 8% of the data has been trimmed. Almost 50% of the
right ascension 17.3 ± 0.6 hours, declination −61 ± 9 degrees      data must be discarded before the significance drops below 4σ
and is statistically preferred over a monopole model at the        showing that the dipole signal is generally present in entire
4.1σ level.                                                        dataset.


to push the result below 4σ, implying a remarkable in-             ferent wavelength settings. This may apply to either or
ternal consistency within the data.                                both Keck and VLT spectra. Since spectrograph slit il-
   Empirical test for systematics.— One potential effec-            luminations are different for quasar (point source) and
tive relative distortion might be due to slight mechanical         ThAr calibration lamp (uniform illumination), the sub-
mis-alignments of the spectrograph slits for the 2 arms,           sequent combination of individual exposures to form a
red and blue, of the UVES spectrograph on the VLT.                 1-dimensional spectrum may then contain relative veloc-
However, this specific effect appears to be substantially            ity shifts between spectral segments coming from differ-
smaller than required to explain values of ∆α/α∼ 10−5              ent exposures. This effect will exist in our data at some
seen in the present work [15].                                     level and it is clearly important to know the impact on
   A more subtle but related effect may be slight off-               an ensemble of measurements of α.
centre placement of the quasar image in the spectrograph              Fortunately, 6 quasars in our sample have both Keck
slit, by different amounts for different exposures, at dif-          and VLT spectra, allowing a direct and empirical check
4

on the effect above, and indeed any other systematics          significant amounts of extra scatter into the data above
which produce relative velocity shifts along the spectrum.    what is already observed, implying that this is an over-
To do this we selected small spectral segments, each a few    estimate of a systematic effect of this type. Additionally,
˚ wide, flanked by unabsorbed continuum flux from the
A                                                             the trend of δv(λobs )i against wavelength is different in
quasar, and fitted Voigt profiles using vpfit, but adding       magnitude and sign for each quasar pair, implying that
an additional free parameter allowing a velocity shift be-    these effects are likely to average out for an ensemble of
tween the Keck and VLT segments, δv(λobs )i , where λobs      observations. Thus, application of the effect as described
is the observed wavelength and i refers to the ith quasar.    above should be regarded as extreme in terms of impact
All available absorption lines in the 6 spectra were used,    on estimating ∆α/α.
including both Lyman-α forest lines and heavy element            Conclusions.— Quasar spectra obtained using 2 sepa-
lines but excluding telluric features. In this way we can     rate observatories reveal a spatial dependence of the fine
map any effective relative distortions in the calibrations     stucture constant at a significance of 4.1σ, estimated con-
between each pair of spectra. A total of 694 measure-         servatively, taking into account both statistical and sys-
ments were used from the 6 pairs of spectra over the          tematic errors. Two independent datasets reveal a strik-
observed wavelength range 3506 < λ < 8945˚.   A               ing internal consistency and the directions of the indepen-
   We formed a composite function δv(λobs ) after first        dently derived spatial dipoles agree well, with a chance
normalising δv(λobs )i = 0 for each i to remove any po-       probability of 4%. The apparent symmetry in magnitude
tential small constant velocity offsets from each spectrum     of the ∆α/α variation between northern and southern
(expected from off-centering of the quasar in the spectro-     hemisphere quasar data is also striking. A subset of the
graph slit), which cannot influence α.                         quasar spectra observed at both observatories permits a
   Finally we fit the composite δvλobs with a linear           direct test for systematics. None are found which are
function f (δv) = aλobs + b where a = (−7 ± 14) ×             likely to emulate the apparent cosmological dipole in α
                −1                                            we detect. To explain our results in terms of systematics
10−5 km s−1 ˚ , b = 0.38 ± 0.71 km s−1 . The final f (δv)
              A
                                                              will require at least 2 different and finely tuned effects.
thus shows a weak (but statistically insignificant) velocity
                                                              Future similar measurements targeting the apparent pole
drift, and provides an empirical transformation between
                                                              and anti-pole directions will maximise detection sensitiv-
the Keck and VLT wavelength scales. For each quasar
                                                              ity, and further observations duplicated on 2 indepen-
absorption system, we modify the input laboratory wave-
                                                              dent telescopes will better constrain systematics. Above
lengths used in the Voigt profile fitting procedure λlab to
                                                              all, an independent technique is required to check these
λlab = λlab + ∆λlab where ∆λlab = λlab δv (λobs )/c, and
                                                              results. Qualitatively, our results suggest a violation of
finally use the λlab to re-compute ∆α/α for the entire
                                                              the Einstein Equivalence Principle, and could infer a very
sample. Since we do not know whether the Keck or the
                                                              large or infinite universe, within which our ‘local’ Hubble
VLT observation causes the non-zero values of the param-
                                                              volume represents a tiny fraction, with correspondingly
eters a, b above, we applied the transformation separately
                                                              small variations in the physical constants.
to both and examine the impact in each case.
                                                                 This work is supported by the Australian Research
   There was one complicating aspect of this effect ex-        Council. RFC is grateful to the Leverhulme Trust for an
cluded from the discussion above, arising from a 7th spec-    Emeritus grant. We thank Steve Curran, Elliott Koch,
tral pair. The δv(λobs )7 showed a more significant non-       Julian Berengut, John Barrow and Paul Davies for dis-
zero slope than the other 6, suggesting a small but signif-   cussions throughout this work.
icant calibration problem with that particular spectrum.
We therefore applied a slightly more complicated trans-
formation to the data to allow for this, using a Monte
Carlo simulation to estimate the potential impact on our
full combined Keck and VLT sample of both the previ-           [1] J. K. Webb et al., Phys. Rev. Lett. 82, 884 (Feb. 1999),
ous effect measured in 6 quasars plus the effect derived             arXiv:astro-ph/9803165.
from the 7th quasar simultaneously, applied in appropri-       [2] V. A. Dzuba, V. V. Flambaum, and J. K.
                                                                   Webb, Phys. Rev. Lett. 82, 888 (Feb. 1999),
ate proportions. The full details of this analysis will be
                                                                   arXiv:physics/9802029.
discussed separately in [9].                                   [3] J. K. Webb et al., Phys. Rev. Lett. 87, 091301 (Aug.
   A systematic of the same magnitude as that from the             2001), arXiv:astro-ph/0012539.
7th pair cannot be present in any large fraction of our        [4] M. T. Murphy, J. K. Webb, and V. V. Flambaum,
data, otherwise it would generate large numbers of no-             Mon. Not. Roy. Astron. Soc. 345, 609 (Oct. 2003),
                                                                   arXiv:astro-ph/0306483.
ticeable outliers. If we apply f (δv) from the 6 quasar
                                                               [5] M. T. Murphy, V. V. Flambaum, and J. K. Webb, in
pairs, the significance of the dipole is reduced to 3.1σ.           Astrophysics, Clocks and Fundamental Constants, Lec-
Blindly including the effect of the 7th pair under a Monte          ture Notes in Physics, Berlin Springer Verlag, Vol. 648,
Carlo method reduces the significance to a most likely              edited by S. G. Karshenboim & E. Peik (2004) pp. 131–
value of 2.2σ. However, in this circumstance we add                150, arXiv:astro-ph/0310318.
5

 [6] H. Chand et al., Astron. Astrophys. 417, 853 (Apr. 2004),
     arXiv:astro-ph/0401094.
 [7] M. T. Murphy, J. K. Webb, and V. V. Flambaum,
     Mon. Not. Roy. Astron. Soc. 384, 1053 (Mar. 2008),
     arXiv:astro-ph/0612407.
 [8] J. A. King et al.(2010), in preparation; to be submitted
     to Mon. Not. Roy. Astron. Soc.
 [9] F. E. Koch et al.(2010), in preparation; to be submitted
     to Mon. Not. Roy. Astron. Soc.
[10] M. T. Murphy et al., Mon. Not. Roy. Astron. Soc. 378,
     221 (Jun. 2007), arXiv:astro-ph/0703623.
[11] M. T. Murphy, “uves popler,” (2010), http://
     astronomy.swin.edu.au/~mmurphy/UVES_popler.
[12] R. F. Carswell, “rdgen,” (2004), http://www.ast.cam.
     ac.uk/~rfc/rdgen.html.
[13] R. F. Carswell and J. K. Webb, “vpfit - Voigt profile
     fitting program. Version 9.5,” (2010), http://www.ast.
     cam.ac.uk/~rfc/vpfit.html.
[14] G. Hinshaw et al., Astrophys. J. Supp. 180, 225 (Feb.
     2009), arXiv:0803.0732.
[15] P. Molaro et al., Astron. Astrophys. 481, 559 (Apr.
     2008), arXiv:0712.3345.




FIG. 5. Supplementary figure. All-sky illustration of the combined Keck and VLT ∆α/α measurements. Squares are VLT
points. Circles are Keck points. Triangles are quasars observed at both Keck and VLT. Symbol size indicates deviation of
∆α/α from the monopole value m in ∆α/α = A cos Θ + m (Figures 2 and 3). The grey shaded area represents the Galactic
plane with the Galactic centre indicated as a bulge. The blue dashed line shows the equatorial region of the α-dipole. More
and larger blue squares are seen south of the equatorial region and more and larger red circles are seen north of it.

1008.3907v1

  • 1.
    Evidence for spatialvariation of the fine structure constant J. K. Webb1 , J. A. King1 , M. T. Murphy2 , V. V. Flambaum1 , R. F. Carswell3 , and M. B. Bainbridge1 1 School of Physics, University of New South Wales, Sydney, NSW 2052, Australia 2 Centre for Astrophysics and Supercomputing, Swinburne University of Technology, Mail H39, PO Box 218, Victoria 3122, Australia and 3 Institute of Astronomy, Madingley Road, Cambridge, CB3 0HA, England. (Dated: August 25, 2010) We previously reported observations of quasar spectra from the Keck telescope suggesting a smaller value of the fine structure constant, α, at high redshift. A new sample of 153 measurements from the ESO Very Large Telescope (VLT), probing a different direction in the universe, also depends on redshift, but in the opposite sense, that is, α appears on average to be larger in the past. The combined dataset is well represented by a spatial dipole, significant at the 4.1σ level, in the direction arXiv:1008.3907v1 [astro-ph.CO] 23 Aug 2010 right ascension 17.3 ± 0.6 hours, declination −61 ± 9 degrees. A detailed analysis for systematics, using observations duplicated at both telescopes, reveals none which are likely to emulate this result. PACS numbers: 06.20.Jr, 95.30.Dr, 95.30.Sf, 98.62.Ra, 98.80.-k, 98.80.Es, 98.80.Jk Quasar spectroscopy as a test of fundamental more extensive sky coverage. The ESO midas pipeline physics.— The vast light-travel times to distant quasars was used for the first data reduction step, including wave- allows us to probe physics at high redshift. The rela- length calibration, although enhancements were made to tive positions of wavenumbers, ωz , of atomic transitions derive a more robust and accurate wavelength solution detected at redshift z = λobs /λlab − 1, can be com- from an improved selection of thorium-argon calibration pared with laboratory values, ω0 , via the relationship lamp emission lines [10]. Echelle spectral orders from sev- 2 2 2 ωz = ω0 + Q αz − α0 /α0 and the coefficient Q mea- eral exposures of a given quasar were combined using sures the sensitivity of a given transition to a change in uves popler [11]. A total of 60 quasar spectra from the α. The variation in both magnitude and sign of Q for dif- VLT have been used for the present work, yielding 153 ferent transitions is a significant advantage of the Many absorption systems. Absorption systems were identified Multiplet method [1, 2], helping to combat potential sys- via a careful visual search of each spectrum, using rd- tematics. gen [12], scanning for commonly detected transitions at The first application of this method, 30 measurements the same redshift, hence aligned in velocity coordinates. of ∆α/α = (αz − α0 ) /α0 , signalled a smaller α at high Several transition matches were required for acceptance redshift at the 3σ significance level. By 2004 we had made and, given the high spectral resolution, chance matches 143 measurements of α covering a wide redshift range, were eliminated. using further data from the Keck telescope obtained by Absorption system modelling.— As in our previous 3 separate groups, supporting our earlier findings, that studies, vpfit was used to model the profiles in each ab- towards that general direction in the universe at least, α sorption system [13] with some enhancements, described may have been smaller at high redshift, at the 5σ level [3– in [8]. A comprehensive list of the transitions used, their 5]. The constant factor at that point was (undesirably) laboratory wavelengths, oscillator strengths, and Q coef- the telescope/instrument. ficients are compiled in [4, 8]. Subsequently, only 1 further independent statistical The following general procedures were adhered to: (i) study has been completed [6], but difficulties with the For each absorption system, physically related parame- analysis methods mean those results do not add to or ters (redshifts and b-parameters) are tied, in order to provide a check on our earlier results [7]. A small num- minimise the required number of free parameters and ber of individual α measurements have been made, but derive the strongest possible constraints on line posi- provide no general conclusions since the systematic com- tions, and hence ∆α/α. (ii) Parameters were tied only ponent of the error on ∆α/α ∼ 10−5 . for species with similar ionisation potentials, to min- New data from the VLT.— We have now analysed imise possible introduction of random effects on α, mim- a large dataset from a different observatory, the VLT. icked by spatial (and hence velocity) segregation effects; Full details and searches for systematic errors will be (iii) Line broadening is typically dominated by turbulent given elsewhere[8, 9]. Here we summarize the evidence rather than thermal motion. Both limiting-case models for spatial variation in α emerging from the combined were applied and ∆α/α determined for each. The final Keck+VLT samples. Quasar spectra, obtained from the ∆α/α was derived from a likelihood-weighted average. ESO Science Archive, were selected, prioritising primar- Details and justification are given in [8]; (iv) Where ap- ily by expected signal to noise but with some preference propriate (and where available), isotopic structures are given to higher redshift objects and to objects giving included in the fitting procedure (for Mgi, Mgii, Aliii,
  • 2.
    2 Siii, and Feii);(v) Velocity structures were determined and hence, on average, observe different directions on the initially choosing the strongest unsaturated transitions sky. We are thus motivated to explore a simple spatial in each system. Normalised residuals across each tran- dependence using the combined dataset. sition fitted were examined and the fit progressively re- The Keck sample we use is as presented in [5] with a fined with the introduction of each additional transition minor modification: 3 points were removed. 2 had been to the fit; (vi) Transitions falling in spectral regions con- included erroneously (from a spectrum known to have taminated by telluric features or atmospheric absorption calibration problems) and 1 further point was clipped, were discarded. Any data regions contaminated by cos- having a residual greater than 3σ against a modified LTS mic rays, faulty CCD pixels, or any other unidentified fit to the Keck data. noise effects, were also discarded; (vii) A few gravita- Initially the 3 datasets (i.e. Keck, VLT and combined) tional lenses were identified by being difficult or impos- are fitted using a simple possible dipole+monopole sible to model successfuly. The non-point source quasar model, represented here by ∆α/α = A cos Θ+m, where m image and the resultant complex line-of-sight geometry is a constant allowing an offset from the terrestrial value, can significantly alter apparent relative line strengths. Θ is the angle on the sky between quasar sightline and These systems were discarded; (viii) In all cases we de- best-fit dipole position, and A is the dipole amplitude. rived the final model without solving for ∆α/α. The To examine the probability of the observed dipole introduction of ∆α/α as an additional free parameter model arising by chance, we bootstrap the sample, re- was only done once the profile velocity structure had peatedly randomising the association between ∆α/α and been finalised, eliminating any possible bias towards a quasar sightline, fitting ∆α/α = A cos Θ + m at each re- ‘preferred’ ∆α/α. One potential consequence of this ap- alisation. We then numerically determine the probability proach might conceivably be a small bias on ∆α/α to- of obtaining a value of χ2 less than or equal to the actual wards zero, should some ‘fitting-away’ of ∆α/α occur, by value by comparing with the χ2 probability distribution column density adjustments or velocity structure deci- from the bootstrap process. sions. The reverse is not true, i.e. it cannot bias towards Figure 1 illustrates the best-fit dipole equatorial co- a non-zero ∆α/α. ordinates on an all-sky map, with approximate 1σ error vpfit [13] minimises χ2 simultaneously over all species. contours derived from the covariance matrix. Figure 2 Whilst the strongest components may appear in all illustrates the ∆α/α binned data and the best-fit dipole species, weaker components can sometimes fall below the model. Best-fit parameters are given in the captions. detection threshold and hence are excluded, such that As a second trial model, allowing for a spatial gradient a component which appears in MgII, for example, does in α, we assign a distance to each ∆α/α measurement not appear in FeII. There is no solution to this (known) of r(z) = ct(z) where c is the speed of light and t(z) problem but its effect merely adds an additional random is the look-back time at redshift z. The model is then scatter on ∆α/α for an ensemble of observations. ∆α/α = Br(z) cos Θ + m. Figure 3 illustrates ∆α/α Spatially dependent α.— An initial inspection of ∆α/α vs look-back time distance projected onto the dipole vs redshift for the new VLT dataset reveals a redshift axis, r cos Θ, using the best-fit dipole parameters for this trend, opposite in sign compared to the earlier Keck model. This model seems to represent the data reason- data. Splitting each sample at z = 1.8, our 2004 Keck ably well and the data show a strong correlation, signifi- sample [5] gave ∆α/α z<1.8 = −0.54 ± 0.12 × 10−5 and cant at the 4.1σ level. ∆α/α z>1.8 = −0.74 ± 0.17 × 10−5 . The present 2010 Given the relatively low statistical significance of the VLT sample, which will be discussed in detail in [8] gives monopole term m for both models above (see captions, ∆α/α z<1.8 = −0.06 ± 0.16 × 10−5 and ∆α/α z>1.8 = Figures 2 and 3), and because the theoretical interpre- +0.61 ± 0.20 × 10−5 . Errors here and throughout this tation of a monopole term is unclear, a third model was paper are 1σ estimates. fitted, ∆α/α = Br cos Θ, giving B = 1.10 ± 0.25 × 10−6 Errors on individual ∆α/α values for the VLT sample GLyr−1 with a significance of 4.2σ and giving parame- 2 2 2 2 are σtot = σstat +σsys , where σsys was derived empirically ters right ascension 17.4 ± 0.6 hours, declination −58 ± 6 using a modification of the Least Trimmed Squares (LTS) degrees. method, where only 85% of data, those points with the An alternative to empirically increasing the ∆α/α er- smallest squared residuals, are fitted. σsys was assumed ror bars to incorporate a systematic component is to as- constant for all VLT absorbers and was found to be ≈ 2 2 sume σtot = σstat and to iteratively trim the data during 0.88 × 10−5 , showing that the scatter in the VLT ∆α/α model fitting. This provides a further stringent test of is greater than expected on the basis of statistical-errors whether the apparent gradient in α is dominated by a alone. Errors on ∆α/α for the Keck sample are discussed subset of the data, perhaps more prone to some unknown in [4], although we derive a new estimate of σsys for the 2 2 systematic than the remainder. Adopting σtot = σstat Keck points using the LTS method. will clearly result in higher significance levels. In Figure The Keck (Mauna Kea, Hawaii) and VLT (Paranal, 4 we plot the statistical significance of the dipole in units Chile) locations on Earth are separated by 45◦ in latitude of σ and find that over 40% of the data must be discarded
  • 3.
    3 FIG. 1. All-skyplot showing the independent Keck (green) and VLT (blue) best-fit dipoles, and the combined sample (red), in equatorial co-ordinates. Approximate 1σ confidence contours are from the covariance matrix. A bootstrap anal- FIG. 3. ∆α/α vs Br cos Θ for the model ∆α/α = Br cos Θ + ysis gives the chance-probability of getting the observed (or m showing the gradient in α along the best-fit dipole. The better) alignment between the independent Keck and VLT best-fit direction is at right ascension 17.4±0.6 hours, declina- dipoles is only 4%. The cosmic microwave background dipole tion −62±6 degrees, for which B = (1.1±0.2)×10−6 GLyr−1 and antipole are illustrated for comparison. and m = (−1.9 ± 0.8) × 10−6 . This dipole+monopole model is statistically preferred over a monopole-only model also at the 4.1σ level. A cosmology with parameters (H0 , ΩM , ΩΛ ) = (70.5, 0.2736, 0.726) was used [14]. FIG. 4. As an alternative to increasing ∆α/α error bars, to account for the additional scatter in the data as described in 2 2 FIG. 2. ∆α/α for the combined Keck and VLT data vs angle the text, we instead use σtot = σstat and iteratively clip the Θ from best-fit dipole, ∆α/α = A cos Θ + m, A = (0.97 ± most deviant ∆α/α value, fitting ∆α/α = A cos Θ + m. The 0.21) × 10−5 and m = (−0.18 ± 0.08) × 10−5 . Dashed lines vertical dashed line illustrates where the dotted curve χ2 = 1, ν illustrate ±1σ errors on the dipole fit. The best-fit dipole is at when ∼ 8% of the data has been trimmed. Almost 50% of the right ascension 17.3 ± 0.6 hours, declination −61 ± 9 degrees data must be discarded before the significance drops below 4σ and is statistically preferred over a monopole model at the showing that the dipole signal is generally present in entire 4.1σ level. dataset. to push the result below 4σ, implying a remarkable in- ferent wavelength settings. This may apply to either or ternal consistency within the data. both Keck and VLT spectra. Since spectrograph slit il- Empirical test for systematics.— One potential effec- luminations are different for quasar (point source) and tive relative distortion might be due to slight mechanical ThAr calibration lamp (uniform illumination), the sub- mis-alignments of the spectrograph slits for the 2 arms, sequent combination of individual exposures to form a red and blue, of the UVES spectrograph on the VLT. 1-dimensional spectrum may then contain relative veloc- However, this specific effect appears to be substantially ity shifts between spectral segments coming from differ- smaller than required to explain values of ∆α/α∼ 10−5 ent exposures. This effect will exist in our data at some seen in the present work [15]. level and it is clearly important to know the impact on A more subtle but related effect may be slight off- an ensemble of measurements of α. centre placement of the quasar image in the spectrograph Fortunately, 6 quasars in our sample have both Keck slit, by different amounts for different exposures, at dif- and VLT spectra, allowing a direct and empirical check
  • 4.
    4 on the effectabove, and indeed any other systematics significant amounts of extra scatter into the data above which produce relative velocity shifts along the spectrum. what is already observed, implying that this is an over- To do this we selected small spectral segments, each a few estimate of a systematic effect of this type. Additionally, ˚ wide, flanked by unabsorbed continuum flux from the A the trend of δv(λobs )i against wavelength is different in quasar, and fitted Voigt profiles using vpfit, but adding magnitude and sign for each quasar pair, implying that an additional free parameter allowing a velocity shift be- these effects are likely to average out for an ensemble of tween the Keck and VLT segments, δv(λobs )i , where λobs observations. Thus, application of the effect as described is the observed wavelength and i refers to the ith quasar. above should be regarded as extreme in terms of impact All available absorption lines in the 6 spectra were used, on estimating ∆α/α. including both Lyman-α forest lines and heavy element Conclusions.— Quasar spectra obtained using 2 sepa- lines but excluding telluric features. In this way we can rate observatories reveal a spatial dependence of the fine map any effective relative distortions in the calibrations stucture constant at a significance of 4.1σ, estimated con- between each pair of spectra. A total of 694 measure- servatively, taking into account both statistical and sys- ments were used from the 6 pairs of spectra over the tematic errors. Two independent datasets reveal a strik- observed wavelength range 3506 < λ < 8945˚. A ing internal consistency and the directions of the indepen- We formed a composite function δv(λobs ) after first dently derived spatial dipoles agree well, with a chance normalising δv(λobs )i = 0 for each i to remove any po- probability of 4%. The apparent symmetry in magnitude tential small constant velocity offsets from each spectrum of the ∆α/α variation between northern and southern (expected from off-centering of the quasar in the spectro- hemisphere quasar data is also striking. A subset of the graph slit), which cannot influence α. quasar spectra observed at both observatories permits a Finally we fit the composite δvλobs with a linear direct test for systematics. None are found which are function f (δv) = aλobs + b where a = (−7 ± 14) × likely to emulate the apparent cosmological dipole in α −1 we detect. To explain our results in terms of systematics 10−5 km s−1 ˚ , b = 0.38 ± 0.71 km s−1 . The final f (δv) A will require at least 2 different and finely tuned effects. thus shows a weak (but statistically insignificant) velocity Future similar measurements targeting the apparent pole drift, and provides an empirical transformation between and anti-pole directions will maximise detection sensitiv- the Keck and VLT wavelength scales. For each quasar ity, and further observations duplicated on 2 indepen- absorption system, we modify the input laboratory wave- dent telescopes will better constrain systematics. Above lengths used in the Voigt profile fitting procedure λlab to all, an independent technique is required to check these λlab = λlab + ∆λlab where ∆λlab = λlab δv (λobs )/c, and results. Qualitatively, our results suggest a violation of finally use the λlab to re-compute ∆α/α for the entire the Einstein Equivalence Principle, and could infer a very sample. Since we do not know whether the Keck or the large or infinite universe, within which our ‘local’ Hubble VLT observation causes the non-zero values of the param- volume represents a tiny fraction, with correspondingly eters a, b above, we applied the transformation separately small variations in the physical constants. to both and examine the impact in each case. This work is supported by the Australian Research There was one complicating aspect of this effect ex- Council. RFC is grateful to the Leverhulme Trust for an cluded from the discussion above, arising from a 7th spec- Emeritus grant. We thank Steve Curran, Elliott Koch, tral pair. The δv(λobs )7 showed a more significant non- Julian Berengut, John Barrow and Paul Davies for dis- zero slope than the other 6, suggesting a small but signif- cussions throughout this work. icant calibration problem with that particular spectrum. We therefore applied a slightly more complicated trans- formation to the data to allow for this, using a Monte Carlo simulation to estimate the potential impact on our full combined Keck and VLT sample of both the previ- [1] J. K. Webb et al., Phys. Rev. Lett. 82, 884 (Feb. 1999), ous effect measured in 6 quasars plus the effect derived arXiv:astro-ph/9803165. from the 7th quasar simultaneously, applied in appropri- [2] V. A. Dzuba, V. V. Flambaum, and J. K. Webb, Phys. Rev. Lett. 82, 888 (Feb. 1999), ate proportions. The full details of this analysis will be arXiv:physics/9802029. discussed separately in [9]. [3] J. K. Webb et al., Phys. Rev. Lett. 87, 091301 (Aug. A systematic of the same magnitude as that from the 2001), arXiv:astro-ph/0012539. 7th pair cannot be present in any large fraction of our [4] M. T. Murphy, J. K. Webb, and V. V. Flambaum, data, otherwise it would generate large numbers of no- Mon. Not. Roy. Astron. Soc. 345, 609 (Oct. 2003), arXiv:astro-ph/0306483. ticeable outliers. If we apply f (δv) from the 6 quasar [5] M. T. Murphy, V. V. Flambaum, and J. K. Webb, in pairs, the significance of the dipole is reduced to 3.1σ. Astrophysics, Clocks and Fundamental Constants, Lec- Blindly including the effect of the 7th pair under a Monte ture Notes in Physics, Berlin Springer Verlag, Vol. 648, Carlo method reduces the significance to a most likely edited by S. G. Karshenboim & E. Peik (2004) pp. 131– value of 2.2σ. However, in this circumstance we add 150, arXiv:astro-ph/0310318.
  • 5.
    5 [6] H.Chand et al., Astron. Astrophys. 417, 853 (Apr. 2004), arXiv:astro-ph/0401094. [7] M. T. Murphy, J. K. Webb, and V. V. Flambaum, Mon. Not. Roy. Astron. Soc. 384, 1053 (Mar. 2008), arXiv:astro-ph/0612407. [8] J. A. King et al.(2010), in preparation; to be submitted to Mon. Not. Roy. Astron. Soc. [9] F. E. Koch et al.(2010), in preparation; to be submitted to Mon. Not. Roy. Astron. Soc. [10] M. T. Murphy et al., Mon. Not. Roy. Astron. Soc. 378, 221 (Jun. 2007), arXiv:astro-ph/0703623. [11] M. T. Murphy, “uves popler,” (2010), http:// astronomy.swin.edu.au/~mmurphy/UVES_popler. [12] R. F. Carswell, “rdgen,” (2004), http://www.ast.cam. ac.uk/~rfc/rdgen.html. [13] R. F. Carswell and J. K. Webb, “vpfit - Voigt profile fitting program. Version 9.5,” (2010), http://www.ast. cam.ac.uk/~rfc/vpfit.html. [14] G. Hinshaw et al., Astrophys. J. Supp. 180, 225 (Feb. 2009), arXiv:0803.0732. [15] P. Molaro et al., Astron. Astrophys. 481, 559 (Apr. 2008), arXiv:0712.3345. FIG. 5. Supplementary figure. All-sky illustration of the combined Keck and VLT ∆α/α measurements. Squares are VLT points. Circles are Keck points. Triangles are quasars observed at both Keck and VLT. Symbol size indicates deviation of ∆α/α from the monopole value m in ∆α/α = A cos Θ + m (Figures 2 and 3). The grey shaded area represents the Galactic plane with the Galactic centre indicated as a bulge. The blue dashed line shows the equatorial region of the α-dipole. More and larger blue squares are seen south of the equatorial region and more and larger red circles are seen north of it.