Software Testing An overview
Introduction & Fundamentals What is Software Testing? Why testing is necessary? Who does the testing?  What has to be tested? When is testing done?   How often to test?
Most Common Software problems Incorrect calculation Incorrect data edits & ineffective data edits  Incorrect matching and merging of data Data searches that yields incorrect results Incorrect processing of data relationship Incorrect coding / implementation of business rules Inadequate software performance
Confusing or misleading data Software usability by end users &    Obsolete Software Inconsistent processing Unreliable results or performance Inadequate support of business needs Incorrect or inadequate interfaces    with other systems Inadequate performance and security    controls Incorrect file handling
Objectives of testing Executing a program with the intent of finding an  error . To check if the system meets the requirements and be executed successfully in the Intended environment. To check if the system is “ Fit for purpose”. To check if the system does what it is expected to do.
Objectives of testing A good test case is one that has a probability of finding an as yet undiscovered error. A successful test is one that uncovers a yet undiscovered error. A good test is not redundant. A good test should be “best of breed”. A good test should neither be too simple nor too complex.
Objective of a Software Tester Find bugs as early as possible and make sure they get fixed. To understand the application well. Study the functionality in detail to find where the bugs are likely to occur. Study the code to ensure that each and every line of code is tested. Create test cases in such a way that testing is done to uncover the hidden bugs and also ensure that the software is usable and reliable
VERIFICATION & VALIDATION Verification  - typically involves reviews and meeting to evaluate documents, plans, code, requirements, and specifications. This can be done with checklists, issues lists, walkthroughs, and inspection meeting. Validation  - typically involves actual testing and takes place after verifications are completed. Validation and Verification process continue in a cycle till the software becomes defects free.
TESTABILITY Operability  Observe-ability Controllability  Decomposability  Stability Understandability
Plan Do Check Action Software Development Process Cycle
PLAN (P):   Device a plan. Define your objective and determine the strategy  and supporting methods required to achieve that objective. DO (D):   Execute the plan. Create the conditions and perform the necessary training to execute the plan. CHECK (C):  Check the results. Check to determine whether work is progressing according to the plan and whether the results are obtained. ACTION (A):  Take the necessary and appropriate action if checkup reveals that the work is not being performed according to plan or not as anticipated.
QUALITY PRINCIPLES Quality  - the most important factor affecting an organization’s long-term performance.  Quality -  the way to achieve improved productivity and competitiveness in any organization.  Quality  - saves. It does not cost.  Quality - is the solution to the problem, not a problem.
Cost of Quality Prevention Cost   Amount spent before the product is actually built. Cost incurred on establishing methods and procedures, training workers, acquiring tools and planning for quality.  Appraisal cost Amount spent after the product is built but before it is shipped to the user. Cost of inspection, testing, and reviews.
Failure Cost   Amount spent to repair failures. Cost associated with defective products that have been delivered to the user or moved into production, costs involve repairing products to make them fit as per requirement.
An activity which verifies if the product meets pre-defined standards. An activity that establishes and evaluates the processes to produce the products. The process by which product quality is compared with applicable standards; and the action taken when non-conformance is detected. A planned and systematic set of activities necessary to provide adequate confidence that requirements are properly established and products or services conform to specified requirements. Quality Control Quality Assurance
Identifies defects for the primary purpose of correcting defects. Identifies weaknesses in processes and improves them. Verifies if specific attributes are in a specific product or Service Sets up measurements programs to evaluate processes. Implements the process. Helps establish processes. Quality Control Quality Assurance
Responsibilities of QA and QC   QC evaluates if the application is working for the primary purpose of determining if there is a flaw / defect in the functionalities. QA evaluates whether or not quality control is working for the primary purpose of determining whether or not there is a weakness in the process. Detects, reports and corrects defects Prevents the introduction of issues or defects QC is the responsibility of the tester. QA is the responsibility of the entire team.
Responsibilities of QA and QC   QC personnel may perform quality assurance tasks if and when required. QA personnel should not perform quality control unless doing it to validate quality control is working. QC improves the development of a specific product or service. QA improves the process that is applied to multiple products that will ever be produced by a process.
SEI – CMM Software Engineering Institute ( SEI )  developed Capability Maturity Model ( CMM )  CMM  describes the prime elements - planning, engineering, managing software development and maintenance CMM  can be used for  Software process improvement Software process assessment Software capability evaluations
The CMM is organized into five maturity level Initial Level 1 Repeatable Level 2 Defined Level 3  Managed Level 4 Optimizing Level 5 Disciplined Process Standard Consistence Process Predictable Process Continuous Improvement Process
Phases of SDLC Requirement Specification and  Analysis Design Coding Testing Implementation Maintenance SOFTWARE DEVELOPMENT LIFE CYCLE (SDLC)
Requirement Specification and Analysis User Requirement  Specification (USR) Software Requirement  Specification (SRS)
The output of SRS is the input of design phase.  Two types of design  -  High Level Design (HLD) Low Level Design (LLD) Design
List of modules and a brief description of each module. Brief functionality of each module. Interface relationship among modules. Dependencies between modules (if A exists, B exists etc). Database tables identified along with key elements. Overall architecture diagrams along with technology details. High Level Design (HLD)
Detailed functional logic of the module, in pseudo code. Database tables, with all elements, including their type and size. All interface details. All dependency issues Error message listings Complete input and outputs for a module. Low Level Design (LLD)
Breaking down the product into independent modules to arrive at micro levels.  2 different approaches followed in designing – Top Down Approach Bottom Up Approach The Design process
Top-down approach
Bottom-Up Approach
Coding Developers use the LLD document and write the code in the programming language specified.  Testing The testing process involves development of a test plan, executing the plan and documenting the test results.  Implementation Installation of the product in its operational environment.
Maintenance After the software is released and the client starts using the software, maintenance phase is started. 3 things happen  - Bug fixing, Upgrade, Enhancement Bug fixing  – bugs arrived due to some untested  scenarios.  Upgrade  – Upgrading the application to the newer versions of the software. Enhancement  - Adding some new features into the existing software .
SOFTWARE LIFE CYCLE MODELS WATERFALL MODEL V-PROCESS MODEL SPIRAL MODEL PROTOTYPE MODEL INCREMENTAL MODEL EVOLUTIONARY DEVELOPMENT MODEL
Project Management Project Staffing Project Planning Project Scheduling
Project Staffing Project budget may not allow to utilize   highly – paid staff. Staff with the appropriate experience may not be available.
Project Planning Describes how the skills and experience of the project team members will be developed. Staff  development plan Predicts the maintenance requirements of the  system/ maintenance costs and efforts  required. Maintenance plan Describes the configuration management procedures and structures to be used. Configuration  management plan Describes the approach, resources and  schedule used for system validation. Validation plan Describes the quality procedures and standards used in a project. Quality plan Description Plan
Project Scheduling Bar charts and Activity Networks Scheduling problems
RISK MANAGEMENT Risk identification  Risk Analysis  Risk Planning  Risk Monitoring
There will be a larger number of changes to the requirements than anticipated. Project &  Product Requirements change Hardware which is essential for the project will not be delivered on schedule. Project Hardware  unavailability There will be a change of  organizational management with  different priorities. Project Management change Experienced staff will leave the  project before it is finished. Project Staff  turnover Description Risk type Risk
Specifications of essential interfaces are not available on schedule. Project & Product Specification delays The size of the system has been under estimated. Project &  Product Size under estimate CASE tools which support the project do not perform as anticipated. Product CASE tool under performance The underlying technology on which the system is built is superseded by new technology. Business  Technology change  A competitive product is marketed before the system is completed. Business  Product competition Description Risk type Risk
PC version Initial system DEC version VMS version Unix version Mainframe version Workstation version Configuration Management Sun version
Configuration Management (CM)  Standards CM should be based on a set of standards, which are applied within an organization.
CM Planning Documents, required for future system maintenance, should be identified and included as managed documents.  It defines the types of documents to be managed and a document  naming scheme.
Change Management Keeping and managing the changes and  ensuring that they are implemented in the most cost-effective way.
Change Request form A part of the CM planning process  Records change required Change suggested by Reason why change was suggested  Urgency of change Records change evaluation Impact analysis Change cost Recommendations(system maintenance staff)
VERSION AND RELEASE MANAGEMENT Invent identification scheme for system versions and plan when new system version is to be produced.  Ensure that version management procedures and tools are properly applied and to plan and distribute new system releases.
Versions/Variants/Releases  Variant   An instance of a system which is functionally identical but non – functionally distinct from other instances of a system. Versions  An instance of a system, which is functionally distinct in some way from other system instances. Release   An instance of a system, which is distributed to users outside of the development team.
 
SOFTWARE TESTING LIFECYCLE - PHASES Requirements study Test Case Design and Development Test Execution Test Closure Test Process Analysis
Requirements study Testing Cycle starts with the study of client’s requirements. Understanding of the requirements is very essential for testing the product.
Analysis & Planning Test objective and coverage Overall schedule Standards and Methodologies Resources required, including necessary training Roles and responsibilities of the team members Tools used
Test Case Design and Development  Component Identification Test Specification Design Test Specification Review Test Execution Code Review Test execution and evaluation Performance and simulation
Test Closure Test summary report Project De-brief Project Documentation Test Process Analysis Analysis done on the reports and improving the application’s performance by implementing new technology and additional features.
 
Testing Levels Unit testing Integration testing  System testing Acceptance testing
Unit testing The most ‘micro’ scale of testing. Tests done on particular functions or code modules. Requires knowledge of  the internal program design and code. Done by Programmers (not by testers).
Unit testing  Unit Test Report Output Internal Application Design Master Test Plan Unit Test Plan Input After modules are coded When To test the function of a program or unit of code such as a program or module To test internal logic To verify internal design To test path & conditions coverage To test exception conditions & error handling Objectives
Developer Who White Box testing techniques Test Coverage techniques Methods Debug Re-structure Code Analyzers Path/statement coverage tools Tools Testing Methodology Effective use of tools Education
Incremental integration testing Continuous testing of an application as and when a new functionality is added. Application’s functionality aspects are required to be independent enough to work separately before completion of development. Done by programmers or testers.
Integration Testing Testing of combined parts of an application to  determine their functional correctness. ‘ Parts’ can be  code modules individual applications client/server applications on a network.
Types of Integration Testing Big Bang testing Top Down Integration testing Bottom Up Integration testing
Integration testing   Integration Test report Output Internal & External Application Design Master Test Plan Integration Test Plan Input After modules are unit tested When To technically verify proper interfacing between modules, and within sub-systems Objectives
Developers Who White and Black Box techniques Problem / Configuration Management Methods Debug Re-structure Code Analyzers Tools Testing Methodology Effective use of tools Education
System Testing System Test Report Output Detailed Requirements & External Application Design Master Test Plan System Test Plan Input After Integration Testing When To verify that the system components perform control functions To perform inter-system test To demonstrate that the system performs both functionally and operationally as specified To perform appropriate types of tests relating to Transaction Flow, Installation, Reliability, Regression etc. Objectives
Development Team and Users Who Problem / Configuration Management Methods Recommended set of tools Tools Testing Methodology Effective use of tools Education
Systems Integration Testing   Systems Integration Test report Output Test Strategy Master Test Plan Systems Integration Test Plan Input After system testing Often performed outside of project life-cycle When To test the co-existence of products and applications that are required to perform together in the production-like operational environment (hardware, software, network)  To ensure that the system functions together with all the components of its environment as a total system To ensure that the system releases can be deployed in the current environment Objectives
System Testers Who White and Black Box techniques Problem / Configuration Management Methods Recommended set of tools Tools Testing Methodology Effective use of tools Education
Acceptance Testing User Acceptance Test report Output Business Needs & Detailed Requirements Master Test Plan User Acceptance Test Plan Input After System Testing When To verify that the system meets the user requirements Objectives
Users / End Users Who Black Box techniques Problem / Configuration  Management Methods Compare, keystroke capture & playback, regression testing Tools Testing Methodology Effective use of tools Product knowledge Business Release Strategy Education
TESTING METHODOLOGIES AND TYPES
Testing methodologies Black box testing White box testing Incremental testing Thread testing
Black box testing No knowledge of internal design or code required. Tests are based on requirements and functionality White box testing Knowledge of the internal program design and code required. Tests are based on coverage of code  statements,branches,paths,conditions.
Incorrect or missing functions Interface errors Errors in data structures or external database access Performance errors Initialization and termination errors Black Box - testing technique
Black box / Functional testing   Based on requirements and functionality Not based on any knowledge of internal design or code Covers all combined parts of a system Tests are data driven
White box testing / Structural testing Based on knowledge of internal logic of an application's code Based on coverage of code statements,  branches, paths, conditions Tests are logic driven
Functional testing Black box type testing geared to functional    requirements of an application. Done by testers. System testing Black box type testing that is based on overall requirements specifications; covering all combined parts of the system. End-to-end testing Similar to system testing; involves testing of a complete application environment in a situation that mimics real-world use.
Sanity testing Initial effort to determine if a new software version is performing well enough to accept it for a major testing effort. Regression testing Re-testing after fixes or modifications of the software or its environment.
Acceptance testing Final testing based on specifications of the end-user or customer  Load testing Testing an application under heavy loads. Eg. Testing of a web site under a range of loads to determine, when the system response time degraded or fails.
Stress Testing Testing under unusually heavy loads, heavy    repetition of certain actions or inputs, input of  large numerical values, large complex queries  to a database etc. Term often used interchangeably with ‘load’ and ‘performance’ testing. Performance testing Testing how well an application complies to performance requirements.
Install/uninstall testing Testing of full,partial or upgrade install/uninstall process. Recovery testing Testing how well a system recovers from crashes, HW failures or other problems. Compatibility testing Testing how well software performs in a particular HW/SW/OS/NW environment.
Exploratory testing / ad-hoc testing Informal SW test that is not based on formal test plans or test cases; testers will be learning the SW in totality as they test it. Comparison testing Comparing SW strengths and weakness to competing products.
Alpha testing Testing done when development is nearing completion; minor design changes may still be made as a result of such testing. Beta-testing Testing when development and testing are essentially completed and final bugs and problems need to be found before release.
Mutation testing To determining if a set of test data or test cases is useful, by deliberately introducing various bugs. Re-testing with the original test data/cases to determine if the bugs are detected.
 
White Box - testing technique All independent paths within a module have been exercised at least once Exercise all logical decisions on their  true  and  false  sides Execute all loops at their boundaries and within their operational bounds Exercise internal data structures to ensure their validity
This white box technique focuses on the validity of loop constructs.  4 different classes of loops can be defined  simple loops  nested loops  concatenated loops Unstructured loops  Loop Testing
Other White Box Techniques   Statement Coverage   – execute all statements at least once Decision Coverage  – execute each decision direction at least once Condition Coverage  – execute each decision with all possible outcomes at least once  Decision / Condition  coverage  – execute all possible combinations of condition outcomes in each decision.  Multiple condition Coverage  – Invokes each point of entry at least once. Examples ……
Statement Coverage – Examples Eg. A + B If (A = 3) Then B = X + Y End-If While (A > 0) Do Read (X) A = A - 1 End-While-Do
Decision Coverage - Example If A < 10 or A > 20 Then  B = X + Y Condition Coverage – Example A = X  If (A > 3) or (A < B) Then B = X + Y End-If-Then While (A > 0) and (Not EOF) Do Read (X) A = A - 1 End-While-Do
Incremental Testing A disciplined method of testing the interfaces between unit-tested programs as well as between system components.  Involves adding unit-testing program module or component one by one, and testing each result and combination.
There are two types of incremental testing Top-down   – testing form the top of the module hierarchy and work down to the bottom. Modules are added in descending hierarchical order. Bottom-up  – testing from the bottom of the hierarchy and works up to the top. Modules are added in ascending hierarchical order.
X Acceptance Testing X System Testing X X X Integration Testing X Unit Testing Thread Incre- mental Black Box White Box Testing Levels/  Techniques
Major Testing Types Stress / Load Testing Performance Testing Recovery Testing Conversion Testing Usability Testing Configuration Testing
Stress / Load Test Evaluates a system or component at or beyond the limits of its specified requirements. Determines the load under which it fails and  how.
Performance Test Evaluate the compliance of a system or component with specified performance requirements.  Often performed using an automated test tool to simulate large number of users.
Recovery Test Confirms that the system recovers from expected or unexpected events without loss of data or functionality.  Eg. Shortage of disk space Unexpected loss of communication Power out conditions
Conversion Test Testing of code that is used to convert data from existing systems for use in the newly replaced systems
Usability Test Testing the system for the users to learn and use the product.
Configuration Test Examines an application's requirements for pre-existing software, initial states and configuration in order to maintain proper functionality.
SOFTWARE TESTING LIFECYCLE - PHASES Requirements study Test Case Design and Development Test Execution Test Closure Test Process Analysis
Requirements study Testing Cycle starts with the study of client’s requirements. Understanding of the requirements is very essential for testing the product.
Analysis & Planning Test objective and coverage Overall schedule Standards and Methodologies Resources required, including necessary training Roles and responsibilities of the team members Tools used
Test Case Design and Development  Component Identification Test Specification Design Test Specification Review Test Execution Code Review Test execution and evaluation Performance and simulation
Test Closure Test summary report Project Documentation Test Process Analysis Analysis done on the reports and improving the application’s performance by implementing new technology and additional features.
TEST PLAN   Objectives To create a set of testing tasks. Assign resources to each testing task. Estimate completion time for each testing task. Document testing standards.
A document that describes the   scope   approach   resources   schedule … of intended test activities.  Identifies the  test items features to be tested testing tasks task allotment risks requiring contingency planning.
Purpose of preparing a Test Plan Validate the acceptability of a software product.  Help the people outside the test group to understand ‘why’ and ‘how’ of product validation.  A Test Plan should be thorough enough (Overall coverage of test to be conducted) useful and understandable by the people inside and outside the test group.
Scope The areas to be tested by the QA team. Specify the areas which are out of scope (screens,    database, mainframe processes etc). Test Approach Details on how the testing is to be performed. Any specific strategy is to be followed for  testing (including configuration management).
Entry Criteria Various steps to be performed before the start of a test i.e. Pre-requisites. E.g. Timely environment set up Starting the web server/app server Successful implementation of the latest build etc. Resources List of the people involved in the project and their designation etc.
Tasks/Responsibilities Tasks to be performed and responsibilities assigned to the various team members. Exit Criteria Contains tasks like  Bringing down the system / server Restoring system to pre-test environment Database refresh etc. Schedule / Milestones Deals with the final delivery date and the various milestones dates.
Hardware / Software Requirements Details of PC’s / servers required to install the  application or perform the testing Specific software to get the application  running or to connect to the database etc. Risks & Mitigation Plans List out the possible risks during testing Mitigation plans to implement incase the risk  actually turns into a reality.
Tools to be used List the testing tools or utilities  Eg.WinRunner, LoadRunner, Test Director, Rational Robot, QTP. Deliverables Various deliverables due to the client at various  points of time i.e. Daily / weekly / start of the  project end of the project etc.  These include test plans, test procedures, test  metric, status reports, test scripts etc.
References Procedures Templates (Client specific or otherwise) Standards / Guidelines e.g. Qview Project related documents (RSD, ADD, FSD etc).
Annexure Links to documents which have been / will be used in the course of testing  Eg. Templates used for reports, test cases etc.  Referenced documents can also be attached here. Sign-off Mutual agreement between the client and the QA Team. Both leads/managers signing their agreement on the Test Plan.
Good Test Plans Developed and Reviewed early. Clear, Complete and Specific Specifies tangible deliverables that can be inspected. Staff knows what to expect and when to expect it.
Good Test Plans Realistic quality levels for goals Includes time for planning Can be monitored and updated Includes user responsibilities Based on past experience Recognizes learning curves
TEST CASES   Test case   is defined as A set of test inputs, execution conditions and expected results, developed for a particular objective. Documentation specifying inputs, predicted results and a set of execution conditions for a test item.
Specific inputs that will be tried and the procedures that will be followed when the software tested.  Sequence of one or more subtests executed as a sequence as the outcome and/or final state of one subtests is the input and/or initial state of the next. Specifies the pretest state of the AUT and its environment, the test inputs or conditions. The expected result specifies what the AUT should produce from the test inputs.
Good Test Plans Developed and Reviewed early. Clear, Complete and Specific Specifies tangible deliverables that can be inspected. Staff knows what to expect and when to expect it.
Good Test Plans Realistic quality levels for goals Includes time for planning Can be monitored and updated Includes user responsibilities Based on past experience Recognizes learning curves
Test Cases Contents Test plan reference id Test case Test condition Expected behavior
Good Test Cases Find Defects Have high probability of finding a new defect. Unambiguous tangible result that can be inspected. Repeatable and predictable.
Good Test Cases Traceable to requirements or design documents Push systems to its limits Execution and tracking can be automated Do not mislead Feasible
Defect Life Cycle What is Defect? A defect is a variance from a desired product attribute.   Two categories of defects are  Variance from product specifications Variance from Customer/User expectations
Variance from product specification   Product built varies from the product specified.  Variance from Customer/User  specification A specification by the user not in the built product, but something not specified has been included.
Defect categories Wrong   The specifications have been implemented incorrectly.  Missing   A   specified requirement is not in the built   product.   Extra   A requirement incorporated into the product that was not specified.
Defect Log Defect ID number Descriptive defect name and type Source of defect – test case or other source Defect severity Defect Priority Defect status (e.g. New, open, fixed, closed, reopen, reject)
Date and time tracking for either the most recent status change, or for each change in the status. Detailed description, including the steps necessary to reproduce the defect. Component or program where defect was found Screen prints, logs, etc. that will aid the developer in resolution process. Stage of origination. Person assigned to research and/or corrects the defect.
Severity Vs Priority Severity Factor that shows how bad the defect is and the impact it has on the product Priority Based upon input from users regarding which defects are most important to them, and be fixed first.
Severity Levels Critical Major / High Average / Medium Minor / low Cosmetic defects
Severity Level – Critical An installation process which does not load a component. A missing menu option. Security permission required to access a function under test. Functionality does not permit for further testing.
Runtime Errors like JavaScript errors etc. Functionality Missed out / Incorrect Implementation (Major Deviation from Requirements). Performance Issues (If specified by Client). Browser incompatibility and Operating systems incompatibility issues depending on the impact of error. Dead Links.
Severity Level – Major / High Reboot the system. The wrong field being updated. An updated operation that fails to complete. Performance Issues (If not specified by Client). Mandatory Validations for Mandatory Fields.
Functionality incorrectly implemented (Minor Deviation from Requirements). Images, Graphics missing which hinders functionality. Front End / Home Page Alignment issues. Severity Level – Average / Medium Incorrect/missing hot key operation.
Severity Level – Minor / Low Misspelled or ungrammatical text Inappropriate or incorrect formatting (such as text font, size, alignment, color, etc.) Screen Layout Issues Spelling Mistakes / Grammatical Mistakes Documentation Errors
Page Titles Missing  Alt Text for Images Background Color for the Pages other than Home page Default Value missing for the fields required Cursor Set Focus and Tab Flow on the Page Images, Graphics missing, which does not, hinders functionality
Test Reports 8 INTERIM REPORTS Functional Testing Status Functions Working Timeline Expected Vs Actual Defects Detected Timeline Defects Detected Vs Corrected Gap Timeline Average Age of Detected Defects by type Defect Distribution Relative Defect Distribution Testing Action
Functional Testing Status Report Report shows percentage of the functions that are Fully Tested Tested with Open defects Not Tested
Functions Working Timeline Report shows the actual plan to have all functions verses the current status of the functions working. Line graph is an ideal format.
Expected Vs. Actual Defects Detected Analysis between the number of defects being generated against the expected number of defects expected from the planning stage.
Defects Detected Vs. Corrected Gap A line graph format that shows the Number of defects uncovered verses the number of defects being corrected and accepted by the testing group.
Average Age Detected Defects by Type Average days of outstanding defects by its  severity type or level. The planning stage provides the acceptable open days by defect type.
Defect Distribution Shows defect distribution by function or module and the number of tests completed. Relative Defect Distribution Normalize the level of defects with the  previous reports generated.  Normalizing over the number of functions or lines of code shows a more accurate level of  defects.
Testing Action Report shows Possible shortfalls in testing Number of severity-1 defects Priority of defects Recurring defects Tests behind schedule … .and other information that present an accurate testing picture
METRICS 2 Types  Product metrics Process metrics
Process Metrics Measures the characteristic of the  methods techniques tools
Product Metrics M easures the characteristic of the  documentation and code.
Test Metrics User Participation   = User Participation test time  Vs.  Total test time. Path Tested  =  Number of path tested  Vs.  Total number of paths. Acceptance criteria tested   = Acceptance criteria verified  Vs.  Total acceptance criteria.
Test cost  = Test cost  Vs.  Total system cost. Cost to locate defect   = Test cost / No. of defects located in the testing.   Detected production defect  = No. of defects detected in production / Application system size. Test Automation   = Cost of manual test effort / Total test cost.
CMM – Level 1 – Initial Level The organization  Does not have an environment for developing  and maintaining software.  At the time of crises, projects usually stop using all planned procedures and revert to coding and testing.
CMM – Level 2 – Repeatable level Effective management process having established which can be  Practiced Documented Enforced Trained Measured  Improvised
CMM – Level 3 – Defined level Standard defined software engineering and management process for developing and  maintaining software. These processes are put together to make a  coherent whole.
CMM – Level 4 – Managed level Quantitative goals set for both software products and  processes. The organizational measurement plan involves determining the productivity and quality for all  important software process activities across all  projects.
CMM – Level 5 – Optimizing level Emphasis laid on  Process improvement Tools to identify weaknesses existing in their processes Make timely corrections
TESTING STANDARDS External Standards   Familiarity with and adoption of industry test standards from organizations. Internal Standards   Development and enforcement of the test standards that testers must meet.
IEEE STANDARDS Institute of Electrical and Electronics Engineers designed an entire set of standards for software and to be followed by the testers.
IEEE  –  Standard Glossary of Software Engineering Terminology IEEE  –  Standard for Software Quality Assurance Plan IEEE  –  Standard for Software Configuration Management Plan IEEE  –  Standard for Software for Software Test Documentation IEEE  –  Recommended Practice for Software Requirement Specification
IEEE  –  Standard for Software Unit Testing IEEE  –  Standard for Software Verification and Validation IEEE  –  Standard for Software Reviews IEEE  –  Recommended practice for Software Design descriptions IEEE  –  Standard Classification for Software Anomalies
IEEE  –  Standard for Software Productivity metrics IEEE  –  Standard for Software Project Management plans IEEE  –  Standard for Software Management IEEE  –  Standard for Software Quality Metrics Methodology
Other standards….. ISO  –  International Organization for Standards Six Sigma  –  Zero Defect Orientation SPICE  –  Software Process Improvement and Capability Determination NIST  –  National Institute of Standards and Technology

Softwaretesting

  • 1.
  • 2.
    Introduction & FundamentalsWhat is Software Testing? Why testing is necessary? Who does the testing? What has to be tested? When is testing done? How often to test?
  • 3.
    Most Common Softwareproblems Incorrect calculation Incorrect data edits & ineffective data edits Incorrect matching and merging of data Data searches that yields incorrect results Incorrect processing of data relationship Incorrect coding / implementation of business rules Inadequate software performance
  • 4.
    Confusing or misleadingdata Software usability by end users & Obsolete Software Inconsistent processing Unreliable results or performance Inadequate support of business needs Incorrect or inadequate interfaces with other systems Inadequate performance and security controls Incorrect file handling
  • 5.
    Objectives of testingExecuting a program with the intent of finding an error . To check if the system meets the requirements and be executed successfully in the Intended environment. To check if the system is “ Fit for purpose”. To check if the system does what it is expected to do.
  • 6.
    Objectives of testingA good test case is one that has a probability of finding an as yet undiscovered error. A successful test is one that uncovers a yet undiscovered error. A good test is not redundant. A good test should be “best of breed”. A good test should neither be too simple nor too complex.
  • 7.
    Objective of aSoftware Tester Find bugs as early as possible and make sure they get fixed. To understand the application well. Study the functionality in detail to find where the bugs are likely to occur. Study the code to ensure that each and every line of code is tested. Create test cases in such a way that testing is done to uncover the hidden bugs and also ensure that the software is usable and reliable
  • 8.
    VERIFICATION & VALIDATIONVerification - typically involves reviews and meeting to evaluate documents, plans, code, requirements, and specifications. This can be done with checklists, issues lists, walkthroughs, and inspection meeting. Validation - typically involves actual testing and takes place after verifications are completed. Validation and Verification process continue in a cycle till the software becomes defects free.
  • 9.
    TESTABILITY Operability Observe-ability Controllability Decomposability Stability Understandability
  • 10.
    Plan Do CheckAction Software Development Process Cycle
  • 11.
    PLAN (P): Device a plan. Define your objective and determine the strategy and supporting methods required to achieve that objective. DO (D): Execute the plan. Create the conditions and perform the necessary training to execute the plan. CHECK (C): Check the results. Check to determine whether work is progressing according to the plan and whether the results are obtained. ACTION (A): Take the necessary and appropriate action if checkup reveals that the work is not being performed according to plan or not as anticipated.
  • 12.
    QUALITY PRINCIPLES Quality - the most important factor affecting an organization’s long-term performance. Quality - the way to achieve improved productivity and competitiveness in any organization. Quality - saves. It does not cost. Quality - is the solution to the problem, not a problem.
  • 13.
    Cost of QualityPrevention Cost Amount spent before the product is actually built. Cost incurred on establishing methods and procedures, training workers, acquiring tools and planning for quality. Appraisal cost Amount spent after the product is built but before it is shipped to the user. Cost of inspection, testing, and reviews.
  • 14.
    Failure Cost Amount spent to repair failures. Cost associated with defective products that have been delivered to the user or moved into production, costs involve repairing products to make them fit as per requirement.
  • 15.
    An activity whichverifies if the product meets pre-defined standards. An activity that establishes and evaluates the processes to produce the products. The process by which product quality is compared with applicable standards; and the action taken when non-conformance is detected. A planned and systematic set of activities necessary to provide adequate confidence that requirements are properly established and products or services conform to specified requirements. Quality Control Quality Assurance
  • 16.
    Identifies defects forthe primary purpose of correcting defects. Identifies weaknesses in processes and improves them. Verifies if specific attributes are in a specific product or Service Sets up measurements programs to evaluate processes. Implements the process. Helps establish processes. Quality Control Quality Assurance
  • 17.
    Responsibilities of QAand QC QC evaluates if the application is working for the primary purpose of determining if there is a flaw / defect in the functionalities. QA evaluates whether or not quality control is working for the primary purpose of determining whether or not there is a weakness in the process. Detects, reports and corrects defects Prevents the introduction of issues or defects QC is the responsibility of the tester. QA is the responsibility of the entire team.
  • 18.
    Responsibilities of QAand QC QC personnel may perform quality assurance tasks if and when required. QA personnel should not perform quality control unless doing it to validate quality control is working. QC improves the development of a specific product or service. QA improves the process that is applied to multiple products that will ever be produced by a process.
  • 19.
    SEI – CMMSoftware Engineering Institute ( SEI ) developed Capability Maturity Model ( CMM ) CMM describes the prime elements - planning, engineering, managing software development and maintenance CMM can be used for Software process improvement Software process assessment Software capability evaluations
  • 20.
    The CMM isorganized into five maturity level Initial Level 1 Repeatable Level 2 Defined Level 3 Managed Level 4 Optimizing Level 5 Disciplined Process Standard Consistence Process Predictable Process Continuous Improvement Process
  • 21.
    Phases of SDLCRequirement Specification and Analysis Design Coding Testing Implementation Maintenance SOFTWARE DEVELOPMENT LIFE CYCLE (SDLC)
  • 22.
    Requirement Specification andAnalysis User Requirement Specification (USR) Software Requirement Specification (SRS)
  • 23.
    The output ofSRS is the input of design phase. Two types of design - High Level Design (HLD) Low Level Design (LLD) Design
  • 24.
    List of modulesand a brief description of each module. Brief functionality of each module. Interface relationship among modules. Dependencies between modules (if A exists, B exists etc). Database tables identified along with key elements. Overall architecture diagrams along with technology details. High Level Design (HLD)
  • 25.
    Detailed functional logicof the module, in pseudo code. Database tables, with all elements, including their type and size. All interface details. All dependency issues Error message listings Complete input and outputs for a module. Low Level Design (LLD)
  • 26.
    Breaking down theproduct into independent modules to arrive at micro levels. 2 different approaches followed in designing – Top Down Approach Bottom Up Approach The Design process
  • 27.
  • 28.
  • 29.
    Coding Developers usethe LLD document and write the code in the programming language specified. Testing The testing process involves development of a test plan, executing the plan and documenting the test results. Implementation Installation of the product in its operational environment.
  • 30.
    Maintenance After thesoftware is released and the client starts using the software, maintenance phase is started. 3 things happen - Bug fixing, Upgrade, Enhancement Bug fixing – bugs arrived due to some untested scenarios. Upgrade – Upgrading the application to the newer versions of the software. Enhancement - Adding some new features into the existing software .
  • 31.
    SOFTWARE LIFE CYCLEMODELS WATERFALL MODEL V-PROCESS MODEL SPIRAL MODEL PROTOTYPE MODEL INCREMENTAL MODEL EVOLUTIONARY DEVELOPMENT MODEL
  • 32.
    Project Management ProjectStaffing Project Planning Project Scheduling
  • 33.
    Project Staffing Projectbudget may not allow to utilize highly – paid staff. Staff with the appropriate experience may not be available.
  • 34.
    Project Planning Describeshow the skills and experience of the project team members will be developed. Staff development plan Predicts the maintenance requirements of the system/ maintenance costs and efforts required. Maintenance plan Describes the configuration management procedures and structures to be used. Configuration management plan Describes the approach, resources and schedule used for system validation. Validation plan Describes the quality procedures and standards used in a project. Quality plan Description Plan
  • 35.
    Project Scheduling Barcharts and Activity Networks Scheduling problems
  • 36.
    RISK MANAGEMENT Riskidentification Risk Analysis Risk Planning Risk Monitoring
  • 37.
    There will bea larger number of changes to the requirements than anticipated. Project & Product Requirements change Hardware which is essential for the project will not be delivered on schedule. Project Hardware unavailability There will be a change of organizational management with different priorities. Project Management change Experienced staff will leave the project before it is finished. Project Staff turnover Description Risk type Risk
  • 38.
    Specifications of essentialinterfaces are not available on schedule. Project & Product Specification delays The size of the system has been under estimated. Project & Product Size under estimate CASE tools which support the project do not perform as anticipated. Product CASE tool under performance The underlying technology on which the system is built is superseded by new technology. Business Technology change A competitive product is marketed before the system is completed. Business Product competition Description Risk type Risk
  • 39.
    PC version Initialsystem DEC version VMS version Unix version Mainframe version Workstation version Configuration Management Sun version
  • 40.
    Configuration Management (CM) Standards CM should be based on a set of standards, which are applied within an organization.
  • 41.
    CM Planning Documents,required for future system maintenance, should be identified and included as managed documents. It defines the types of documents to be managed and a document naming scheme.
  • 42.
    Change Management Keepingand managing the changes and ensuring that they are implemented in the most cost-effective way.
  • 43.
    Change Request formA part of the CM planning process Records change required Change suggested by Reason why change was suggested Urgency of change Records change evaluation Impact analysis Change cost Recommendations(system maintenance staff)
  • 44.
    VERSION AND RELEASEMANAGEMENT Invent identification scheme for system versions and plan when new system version is to be produced. Ensure that version management procedures and tools are properly applied and to plan and distribute new system releases.
  • 45.
    Versions/Variants/Releases Variant An instance of a system which is functionally identical but non – functionally distinct from other instances of a system. Versions An instance of a system, which is functionally distinct in some way from other system instances. Release An instance of a system, which is distributed to users outside of the development team.
  • 46.
  • 47.
    SOFTWARE TESTING LIFECYCLE- PHASES Requirements study Test Case Design and Development Test Execution Test Closure Test Process Analysis
  • 48.
    Requirements study TestingCycle starts with the study of client’s requirements. Understanding of the requirements is very essential for testing the product.
  • 49.
    Analysis & PlanningTest objective and coverage Overall schedule Standards and Methodologies Resources required, including necessary training Roles and responsibilities of the team members Tools used
  • 50.
    Test Case Designand Development Component Identification Test Specification Design Test Specification Review Test Execution Code Review Test execution and evaluation Performance and simulation
  • 51.
    Test Closure Testsummary report Project De-brief Project Documentation Test Process Analysis Analysis done on the reports and improving the application’s performance by implementing new technology and additional features.
  • 52.
  • 53.
    Testing Levels Unittesting Integration testing System testing Acceptance testing
  • 54.
    Unit testing Themost ‘micro’ scale of testing. Tests done on particular functions or code modules. Requires knowledge of the internal program design and code. Done by Programmers (not by testers).
  • 55.
    Unit testing Unit Test Report Output Internal Application Design Master Test Plan Unit Test Plan Input After modules are coded When To test the function of a program or unit of code such as a program or module To test internal logic To verify internal design To test path & conditions coverage To test exception conditions & error handling Objectives
  • 56.
    Developer Who WhiteBox testing techniques Test Coverage techniques Methods Debug Re-structure Code Analyzers Path/statement coverage tools Tools Testing Methodology Effective use of tools Education
  • 57.
    Incremental integration testingContinuous testing of an application as and when a new functionality is added. Application’s functionality aspects are required to be independent enough to work separately before completion of development. Done by programmers or testers.
  • 58.
    Integration Testing Testingof combined parts of an application to determine their functional correctness. ‘ Parts’ can be code modules individual applications client/server applications on a network.
  • 59.
    Types of IntegrationTesting Big Bang testing Top Down Integration testing Bottom Up Integration testing
  • 60.
    Integration testing Integration Test report Output Internal & External Application Design Master Test Plan Integration Test Plan Input After modules are unit tested When To technically verify proper interfacing between modules, and within sub-systems Objectives
  • 61.
    Developers Who Whiteand Black Box techniques Problem / Configuration Management Methods Debug Re-structure Code Analyzers Tools Testing Methodology Effective use of tools Education
  • 62.
    System Testing SystemTest Report Output Detailed Requirements & External Application Design Master Test Plan System Test Plan Input After Integration Testing When To verify that the system components perform control functions To perform inter-system test To demonstrate that the system performs both functionally and operationally as specified To perform appropriate types of tests relating to Transaction Flow, Installation, Reliability, Regression etc. Objectives
  • 63.
    Development Team andUsers Who Problem / Configuration Management Methods Recommended set of tools Tools Testing Methodology Effective use of tools Education
  • 64.
    Systems Integration Testing Systems Integration Test report Output Test Strategy Master Test Plan Systems Integration Test Plan Input After system testing Often performed outside of project life-cycle When To test the co-existence of products and applications that are required to perform together in the production-like operational environment (hardware, software, network) To ensure that the system functions together with all the components of its environment as a total system To ensure that the system releases can be deployed in the current environment Objectives
  • 65.
    System Testers WhoWhite and Black Box techniques Problem / Configuration Management Methods Recommended set of tools Tools Testing Methodology Effective use of tools Education
  • 66.
    Acceptance Testing UserAcceptance Test report Output Business Needs & Detailed Requirements Master Test Plan User Acceptance Test Plan Input After System Testing When To verify that the system meets the user requirements Objectives
  • 67.
    Users / EndUsers Who Black Box techniques Problem / Configuration Management Methods Compare, keystroke capture & playback, regression testing Tools Testing Methodology Effective use of tools Product knowledge Business Release Strategy Education
  • 68.
  • 69.
    Testing methodologies Blackbox testing White box testing Incremental testing Thread testing
  • 70.
    Black box testingNo knowledge of internal design or code required. Tests are based on requirements and functionality White box testing Knowledge of the internal program design and code required. Tests are based on coverage of code statements,branches,paths,conditions.
  • 71.
    Incorrect or missingfunctions Interface errors Errors in data structures or external database access Performance errors Initialization and termination errors Black Box - testing technique
  • 72.
    Black box /Functional testing Based on requirements and functionality Not based on any knowledge of internal design or code Covers all combined parts of a system Tests are data driven
  • 73.
    White box testing/ Structural testing Based on knowledge of internal logic of an application's code Based on coverage of code statements, branches, paths, conditions Tests are logic driven
  • 74.
    Functional testing Blackbox type testing geared to functional requirements of an application. Done by testers. System testing Black box type testing that is based on overall requirements specifications; covering all combined parts of the system. End-to-end testing Similar to system testing; involves testing of a complete application environment in a situation that mimics real-world use.
  • 75.
    Sanity testing Initialeffort to determine if a new software version is performing well enough to accept it for a major testing effort. Regression testing Re-testing after fixes or modifications of the software or its environment.
  • 76.
    Acceptance testing Finaltesting based on specifications of the end-user or customer Load testing Testing an application under heavy loads. Eg. Testing of a web site under a range of loads to determine, when the system response time degraded or fails.
  • 77.
    Stress Testing Testingunder unusually heavy loads, heavy repetition of certain actions or inputs, input of large numerical values, large complex queries to a database etc. Term often used interchangeably with ‘load’ and ‘performance’ testing. Performance testing Testing how well an application complies to performance requirements.
  • 78.
    Install/uninstall testing Testingof full,partial or upgrade install/uninstall process. Recovery testing Testing how well a system recovers from crashes, HW failures or other problems. Compatibility testing Testing how well software performs in a particular HW/SW/OS/NW environment.
  • 79.
    Exploratory testing /ad-hoc testing Informal SW test that is not based on formal test plans or test cases; testers will be learning the SW in totality as they test it. Comparison testing Comparing SW strengths and weakness to competing products.
  • 80.
    Alpha testing Testingdone when development is nearing completion; minor design changes may still be made as a result of such testing. Beta-testing Testing when development and testing are essentially completed and final bugs and problems need to be found before release.
  • 81.
    Mutation testing Todetermining if a set of test data or test cases is useful, by deliberately introducing various bugs. Re-testing with the original test data/cases to determine if the bugs are detected.
  • 82.
  • 83.
    White Box -testing technique All independent paths within a module have been exercised at least once Exercise all logical decisions on their true and false sides Execute all loops at their boundaries and within their operational bounds Exercise internal data structures to ensure their validity
  • 84.
    This white boxtechnique focuses on the validity of loop constructs. 4 different classes of loops can be defined simple loops nested loops concatenated loops Unstructured loops Loop Testing
  • 85.
    Other White BoxTechniques Statement Coverage – execute all statements at least once Decision Coverage – execute each decision direction at least once Condition Coverage – execute each decision with all possible outcomes at least once Decision / Condition coverage – execute all possible combinations of condition outcomes in each decision. Multiple condition Coverage – Invokes each point of entry at least once. Examples ……
  • 86.
    Statement Coverage –Examples Eg. A + B If (A = 3) Then B = X + Y End-If While (A > 0) Do Read (X) A = A - 1 End-While-Do
  • 87.
    Decision Coverage -Example If A < 10 or A > 20 Then B = X + Y Condition Coverage – Example A = X If (A > 3) or (A < B) Then B = X + Y End-If-Then While (A > 0) and (Not EOF) Do Read (X) A = A - 1 End-While-Do
  • 88.
    Incremental Testing Adisciplined method of testing the interfaces between unit-tested programs as well as between system components. Involves adding unit-testing program module or component one by one, and testing each result and combination.
  • 89.
    There are twotypes of incremental testing Top-down – testing form the top of the module hierarchy and work down to the bottom. Modules are added in descending hierarchical order. Bottom-up – testing from the bottom of the hierarchy and works up to the top. Modules are added in ascending hierarchical order.
  • 90.
    X Acceptance TestingX System Testing X X X Integration Testing X Unit Testing Thread Incre- mental Black Box White Box Testing Levels/ Techniques
  • 91.
    Major Testing TypesStress / Load Testing Performance Testing Recovery Testing Conversion Testing Usability Testing Configuration Testing
  • 92.
    Stress / LoadTest Evaluates a system or component at or beyond the limits of its specified requirements. Determines the load under which it fails and how.
  • 93.
    Performance Test Evaluatethe compliance of a system or component with specified performance requirements. Often performed using an automated test tool to simulate large number of users.
  • 94.
    Recovery Test Confirmsthat the system recovers from expected or unexpected events without loss of data or functionality. Eg. Shortage of disk space Unexpected loss of communication Power out conditions
  • 95.
    Conversion Test Testingof code that is used to convert data from existing systems for use in the newly replaced systems
  • 96.
    Usability Test Testingthe system for the users to learn and use the product.
  • 97.
    Configuration Test Examinesan application's requirements for pre-existing software, initial states and configuration in order to maintain proper functionality.
  • 98.
    SOFTWARE TESTING LIFECYCLE- PHASES Requirements study Test Case Design and Development Test Execution Test Closure Test Process Analysis
  • 99.
    Requirements study TestingCycle starts with the study of client’s requirements. Understanding of the requirements is very essential for testing the product.
  • 100.
    Analysis & PlanningTest objective and coverage Overall schedule Standards and Methodologies Resources required, including necessary training Roles and responsibilities of the team members Tools used
  • 101.
    Test Case Designand Development Component Identification Test Specification Design Test Specification Review Test Execution Code Review Test execution and evaluation Performance and simulation
  • 102.
    Test Closure Testsummary report Project Documentation Test Process Analysis Analysis done on the reports and improving the application’s performance by implementing new technology and additional features.
  • 103.
    TEST PLAN Objectives To create a set of testing tasks. Assign resources to each testing task. Estimate completion time for each testing task. Document testing standards.
  • 104.
    A document thatdescribes the scope approach resources schedule … of intended test activities. Identifies the test items features to be tested testing tasks task allotment risks requiring contingency planning.
  • 105.
    Purpose of preparinga Test Plan Validate the acceptability of a software product. Help the people outside the test group to understand ‘why’ and ‘how’ of product validation. A Test Plan should be thorough enough (Overall coverage of test to be conducted) useful and understandable by the people inside and outside the test group.
  • 106.
    Scope The areasto be tested by the QA team. Specify the areas which are out of scope (screens, database, mainframe processes etc). Test Approach Details on how the testing is to be performed. Any specific strategy is to be followed for testing (including configuration management).
  • 107.
    Entry Criteria Varioussteps to be performed before the start of a test i.e. Pre-requisites. E.g. Timely environment set up Starting the web server/app server Successful implementation of the latest build etc. Resources List of the people involved in the project and their designation etc.
  • 108.
    Tasks/Responsibilities Tasks tobe performed and responsibilities assigned to the various team members. Exit Criteria Contains tasks like Bringing down the system / server Restoring system to pre-test environment Database refresh etc. Schedule / Milestones Deals with the final delivery date and the various milestones dates.
  • 109.
    Hardware / SoftwareRequirements Details of PC’s / servers required to install the application or perform the testing Specific software to get the application running or to connect to the database etc. Risks & Mitigation Plans List out the possible risks during testing Mitigation plans to implement incase the risk actually turns into a reality.
  • 110.
    Tools to beused List the testing tools or utilities Eg.WinRunner, LoadRunner, Test Director, Rational Robot, QTP. Deliverables Various deliverables due to the client at various points of time i.e. Daily / weekly / start of the project end of the project etc. These include test plans, test procedures, test metric, status reports, test scripts etc.
  • 111.
    References Procedures Templates(Client specific or otherwise) Standards / Guidelines e.g. Qview Project related documents (RSD, ADD, FSD etc).
  • 112.
    Annexure Links todocuments which have been / will be used in the course of testing Eg. Templates used for reports, test cases etc. Referenced documents can also be attached here. Sign-off Mutual agreement between the client and the QA Team. Both leads/managers signing their agreement on the Test Plan.
  • 113.
    Good Test PlansDeveloped and Reviewed early. Clear, Complete and Specific Specifies tangible deliverables that can be inspected. Staff knows what to expect and when to expect it.
  • 114.
    Good Test PlansRealistic quality levels for goals Includes time for planning Can be monitored and updated Includes user responsibilities Based on past experience Recognizes learning curves
  • 115.
    TEST CASES Test case is defined as A set of test inputs, execution conditions and expected results, developed for a particular objective. Documentation specifying inputs, predicted results and a set of execution conditions for a test item.
  • 116.
    Specific inputs thatwill be tried and the procedures that will be followed when the software tested. Sequence of one or more subtests executed as a sequence as the outcome and/or final state of one subtests is the input and/or initial state of the next. Specifies the pretest state of the AUT and its environment, the test inputs or conditions. The expected result specifies what the AUT should produce from the test inputs.
  • 117.
    Good Test PlansDeveloped and Reviewed early. Clear, Complete and Specific Specifies tangible deliverables that can be inspected. Staff knows what to expect and when to expect it.
  • 118.
    Good Test PlansRealistic quality levels for goals Includes time for planning Can be monitored and updated Includes user responsibilities Based on past experience Recognizes learning curves
  • 119.
    Test Cases ContentsTest plan reference id Test case Test condition Expected behavior
  • 120.
    Good Test CasesFind Defects Have high probability of finding a new defect. Unambiguous tangible result that can be inspected. Repeatable and predictable.
  • 121.
    Good Test CasesTraceable to requirements or design documents Push systems to its limits Execution and tracking can be automated Do not mislead Feasible
  • 122.
    Defect Life CycleWhat is Defect? A defect is a variance from a desired product attribute. Two categories of defects are Variance from product specifications Variance from Customer/User expectations
  • 123.
    Variance from productspecification Product built varies from the product specified. Variance from Customer/User specification A specification by the user not in the built product, but something not specified has been included.
  • 124.
    Defect categories Wrong The specifications have been implemented incorrectly. Missing A specified requirement is not in the built product. Extra A requirement incorporated into the product that was not specified.
  • 125.
    Defect Log DefectID number Descriptive defect name and type Source of defect – test case or other source Defect severity Defect Priority Defect status (e.g. New, open, fixed, closed, reopen, reject)
  • 126.
    Date and timetracking for either the most recent status change, or for each change in the status. Detailed description, including the steps necessary to reproduce the defect. Component or program where defect was found Screen prints, logs, etc. that will aid the developer in resolution process. Stage of origination. Person assigned to research and/or corrects the defect.
  • 127.
    Severity Vs PrioritySeverity Factor that shows how bad the defect is and the impact it has on the product Priority Based upon input from users regarding which defects are most important to them, and be fixed first.
  • 128.
    Severity Levels CriticalMajor / High Average / Medium Minor / low Cosmetic defects
  • 129.
    Severity Level –Critical An installation process which does not load a component. A missing menu option. Security permission required to access a function under test. Functionality does not permit for further testing.
  • 130.
    Runtime Errors likeJavaScript errors etc. Functionality Missed out / Incorrect Implementation (Major Deviation from Requirements). Performance Issues (If specified by Client). Browser incompatibility and Operating systems incompatibility issues depending on the impact of error. Dead Links.
  • 131.
    Severity Level –Major / High Reboot the system. The wrong field being updated. An updated operation that fails to complete. Performance Issues (If not specified by Client). Mandatory Validations for Mandatory Fields.
  • 132.
    Functionality incorrectly implemented(Minor Deviation from Requirements). Images, Graphics missing which hinders functionality. Front End / Home Page Alignment issues. Severity Level – Average / Medium Incorrect/missing hot key operation.
  • 133.
    Severity Level –Minor / Low Misspelled or ungrammatical text Inappropriate or incorrect formatting (such as text font, size, alignment, color, etc.) Screen Layout Issues Spelling Mistakes / Grammatical Mistakes Documentation Errors
  • 134.
    Page Titles Missing Alt Text for Images Background Color for the Pages other than Home page Default Value missing for the fields required Cursor Set Focus and Tab Flow on the Page Images, Graphics missing, which does not, hinders functionality
  • 135.
    Test Reports 8INTERIM REPORTS Functional Testing Status Functions Working Timeline Expected Vs Actual Defects Detected Timeline Defects Detected Vs Corrected Gap Timeline Average Age of Detected Defects by type Defect Distribution Relative Defect Distribution Testing Action
  • 136.
    Functional Testing StatusReport Report shows percentage of the functions that are Fully Tested Tested with Open defects Not Tested
  • 137.
    Functions Working TimelineReport shows the actual plan to have all functions verses the current status of the functions working. Line graph is an ideal format.
  • 138.
    Expected Vs. ActualDefects Detected Analysis between the number of defects being generated against the expected number of defects expected from the planning stage.
  • 139.
    Defects Detected Vs.Corrected Gap A line graph format that shows the Number of defects uncovered verses the number of defects being corrected and accepted by the testing group.
  • 140.
    Average Age DetectedDefects by Type Average days of outstanding defects by its severity type or level. The planning stage provides the acceptable open days by defect type.
  • 141.
    Defect Distribution Showsdefect distribution by function or module and the number of tests completed. Relative Defect Distribution Normalize the level of defects with the previous reports generated. Normalizing over the number of functions or lines of code shows a more accurate level of defects.
  • 142.
    Testing Action Reportshows Possible shortfalls in testing Number of severity-1 defects Priority of defects Recurring defects Tests behind schedule … .and other information that present an accurate testing picture
  • 143.
    METRICS 2 Types Product metrics Process metrics
  • 144.
    Process Metrics Measuresthe characteristic of the methods techniques tools
  • 145.
    Product Metrics Measures the characteristic of the documentation and code.
  • 146.
    Test Metrics UserParticipation = User Participation test time Vs. Total test time. Path Tested = Number of path tested Vs. Total number of paths. Acceptance criteria tested = Acceptance criteria verified Vs. Total acceptance criteria.
  • 147.
    Test cost = Test cost Vs. Total system cost. Cost to locate defect = Test cost / No. of defects located in the testing. Detected production defect = No. of defects detected in production / Application system size. Test Automation = Cost of manual test effort / Total test cost.
  • 148.
    CMM – Level1 – Initial Level The organization Does not have an environment for developing and maintaining software. At the time of crises, projects usually stop using all planned procedures and revert to coding and testing.
  • 149.
    CMM – Level2 – Repeatable level Effective management process having established which can be Practiced Documented Enforced Trained Measured Improvised
  • 150.
    CMM – Level3 – Defined level Standard defined software engineering and management process for developing and maintaining software. These processes are put together to make a coherent whole.
  • 151.
    CMM – Level4 – Managed level Quantitative goals set for both software products and processes. The organizational measurement plan involves determining the productivity and quality for all important software process activities across all projects.
  • 152.
    CMM – Level5 – Optimizing level Emphasis laid on Process improvement Tools to identify weaknesses existing in their processes Make timely corrections
  • 153.
    TESTING STANDARDS ExternalStandards Familiarity with and adoption of industry test standards from organizations. Internal Standards Development and enforcement of the test standards that testers must meet.
  • 154.
    IEEE STANDARDS Instituteof Electrical and Electronics Engineers designed an entire set of standards for software and to be followed by the testers.
  • 155.
    IEEE – Standard Glossary of Software Engineering Terminology IEEE – Standard for Software Quality Assurance Plan IEEE – Standard for Software Configuration Management Plan IEEE – Standard for Software for Software Test Documentation IEEE – Recommended Practice for Software Requirement Specification
  • 156.
    IEEE – Standard for Software Unit Testing IEEE – Standard for Software Verification and Validation IEEE – Standard for Software Reviews IEEE – Recommended practice for Software Design descriptions IEEE – Standard Classification for Software Anomalies
  • 157.
    IEEE – Standard for Software Productivity metrics IEEE – Standard for Software Project Management plans IEEE – Standard for Software Management IEEE – Standard for Software Quality Metrics Methodology
  • 158.
    Other standards….. ISO – International Organization for Standards Six Sigma – Zero Defect Orientation SPICE – Software Process Improvement and Capability Determination NIST – National Institute of Standards and Technology