Ms. Disha Singh [H.O.D. (ECE)]
Table of Content
1. Objective
2. Previous Session Achievements
3. Action Plan Subsections
a) Syllabus Completion
b) Result Improvement
c) Skill Development
d) STEP
e) Research & Publication
f) Industrial Visit
g) Tech-Fest
h) Training & Placement
i) Projects
j) Lab Readiness
k) Short Term Courses
l) Extra Curriculum Activities
8/1/2016 2Ms. Disha Singh/HOD/ECE
Objectives:
To achieve best results among all the institutes and produce university
toppers.
To be known as research institute rather than only academic institute.
Create bridges between industrial and in house products.
To meet the huge requirement of local, national and international
engineering industry.
To be accredited by NBA and other educational association.
To be a Deemed University.
8/1/2016 3Ms. Disha Singh/HOD/ECE
Previous Session Achievements:
100% result in 8th semester with highest SGPA of 9.25.
Abhijeet Singh, [ECE 2012-16 batch] got selected as captain in Indian
Airforce.
Sunil Jhangeela [ECE 2012-2016 batch] got selected as Sub Inspector.
STEP program was conducted successfully.
8/1/2016 4Ms. Disha Singh/HOD/ECE
Action Plan:
(a)Syllabus completion
 Syllabus progress report to be submitted to the HOD after every 15
days .
Student feedback on the quality of teaching learning to be monitored on
07/09/16, 30/09/16, 11/11/16 by the HOD.
8/1/2016 5Ms. Disha Singh/HOD/ECE
Action Plan:
(b) Results Improvement
 Orientation program [28th July-29th July, 2016]
 Bridge courses for higher semester[1st Aug-10th Aug, 2016]
Preparation of notes/course material from multiple references. [On or
before 30th July, 2016.]
Introducing “Open Source Exam” and “Surprise Test” [During last
fortnight of September.]
Fruitful use of digital library viz. NPTEL, Stanford Lectures, MIT
open course etc. [Video lecture downloading completed for few
subjects. Materials will be supplied to students on or before 31st
Aug, 2016. Class teacher will monitor this.]
Introducing multiple Q&A during every planed session.
Prepare model answer sheet for previous year paper/assignment/mock
tests, after completion of every unit.
Planed schedule for MST 1(19/09/16-21/09/16), MST 2 (13/10/16-
15/10/16), PUT (07/11/16-11/11/16)
 Display of Model answer sheet(PUT) 15/11/16.
8/1/2016 6Ms. Disha Singh/HOD/ECE
Action Plan:
(c)Skills Development
Breadboard designing study [20/08/16]
GD/ PI Session [27/08/16]
Introduction to Microcontroller and microprocessor. [17/09/16]
Technical interview session [24/09/16]
Expert lecture on 26/9/16 by Mr. Raja Namdeo on Advance Comm.
Expert lecture on 21/11/16 by Mr. Utsav Malviya on Projects & Industrial
relevance.
8/1/2016 7Ms. Disha Singh/HOD/ECE
Action Plan:
(d) STEP
6 hours per week. [Incorporated already].
Preparation of daily lesson plan and material . [on or before 30th of
July, 2016]
3rd Sem – Introduction to MATLAB (16/08/16 onwards) by Mr. Salil
Jain
 5th Sem – Advanced MATLAB (02/08/16 onwards) by Mr.
Suryabhan Singh
7th Sem – Arduino (02/08/16 onwards) by Mr. U.N Bera.
Checking the availability of the software in the CP Lab and update the
license in each computer. [before 25th July, 2016]
Strictly monitor the attendance. [Once in a fortnight]
Course material should be focused on recent trends and emerging
technology. [Monitored by HOD. [Once in a fortnight]
8/1/2016 8Ms. Disha Singh/HOD/ECE
Action Plan:
(e)Research and Publication
Taking membership of professional society like IET, IEEE, ASME etc.
[Application- 15th Sept, 2016]
Progress seminar once in a month about recent development.
Selecting one or two major fields per faculty. [On or before 15th of
August.]
Minimum 1 publication in three month. [Major review should be
answered and revised at lest. [On or before 15th Oct, 2016]
Fruitful use of library journal subscriptions. [Every fortnight reporting.]
8/1/2016 9Ms. Disha Singh/HOD/ECE
Action Plan:
(f) Industrial Visit
Optical fiber lab, GSM , 3G, 4G lab (BSNL-TTC, Jabalpur)
[10/09/16]
Bargi Hydel Power Plant , Jabalpur [08/10/16]
8/1/2016 10Ms. Disha Singh/HOD/ECE
Action Plan:
(g) Tech- Fest Project
Every faculty has to undertake at least 1 SIE(Social innovation and
Entrepreneurship).
Event(Tech- fest) is scheduled for March – April 2017 .
Need to propose the project details on or before 26/10/16
Active participation on various others events of tech- fest.
8/1/2016 11Ms. Disha Singh/HOD/ECE
Action Plan:
(h) Training & Placement
Individual placement coordinator for dept. [formation of cell by 20th
August, 2016]
Conduct mock interview.[Every Monday and Tuesday by TPO
2016]
Conduct mock GD and Aptitude class. [Every Monday and Tuesday
by TPO 2016]
1 hour course on attractive Resume making. [27th August, 2016]
Provide various resource like freashersword.com, naukri.com for
previous year sample placement paper. [Material Ready]
8/1/2016 12Ms. Disha Singh/HOD/ECE
Action Plan:
(i) Projects
Introducing “Course Projects”. [List of activity is mentioned on
Course files. (On or before 15th August. 2016)]
Preparation of project reference copy and synopsis for every
faculty per project group.[On or before 24th July, 2016]
Establish the culture of “Progress Seminar” at least once in a
month. [Valid for final year students. Guide will monitor the action.
HOD look after all the activity.] [Review dates 14th sep and
25th oct, 2016].
Fruitful use YouTube Channel and other internet sources but in the
same time keep the copyright matter under strict supervision [Before
submission of the printed project report. [Nov 1st week]].
Internal assessment of the projects. Create a panel of faculty with
same field interest. Rigorous comments and criticism. [ 10th Sept,
20th Oct]
Standardize thesis format. [Done]
8/1/2016 13Ms. Disha Singh/HOD/ECE
Action Plan:
(j) LAB Readiness
Strictly monitor by class teacher/course teacher along with TA.
[[Everyday]]
Conduct Lab Viva, journal checking on daily basis. [checked by
HOD]
Lab can be useful for whole day and it will provide maximum
support to the students to complete their course projects/minor
projects/major projects. [Everyday]
After demonstration of TA/Faculty, students will have to perform
the experiment individually and TA should monitor the safety
measure. [[Everyday]]
8/1/2016 14Ms. Disha Singh/HOD/ECE
Action Plan:
(k) Short Term Course
Once in a month.
Lesson plan properly made and course contents will be circulated.
The following are the course name of STC
 PLC [August]
Matlab [NN tool] [September]
Arduino [September]
ANSYS [October]
8/1/2016 15Ms. Disha Singh/HOD/ECE
Action Plan:
(l) Extra Curriculum Activities
Society and clubs formation.
 Robotics Society [Done]
Tech-fest participation at various IITs, IIITs and NITs. [U N Bera]
Re-establishment of CARE [Control, Automation, Robotics
Engineering] Club. [Done]
Society/club having own information uploaded in the website
along with its activities. All the activities will be reported to The
PRINCIPAL. [30th August, 2016]
Provide various resource like freashersword.com, naukri.com for
previous year sample placement paper. [Done]
Successfully completion of academic calendar targets. [Nov 2016]
8/1/2016 16Ms. Disha Singh/HOD/ECE
Thank You
8/1/2016 17Ms. Disha Singh/HOD/ECE

ELECTRONICS & COMMUNICATION ENGINEERING ACTION PLAN

  • 1.
    Action Plan July-December 2016 Departmentof ECE St. Aloysius Institute of Technology By Ms. Disha Singh [H.O.D. (ECE)]
  • 2.
    Table of Content 1.Objective 2. Previous Session Achievements 3. Action Plan Subsections a) Syllabus Completion b) Result Improvement c) Skill Development d) STEP e) Research & Publication f) Industrial Visit g) Tech-Fest h) Training & Placement i) Projects j) Lab Readiness k) Short Term Courses l) Extra Curriculum Activities 8/1/2016 2Ms. Disha Singh/HOD/ECE
  • 3.
    Objectives: To achieve bestresults among all the institutes and produce university toppers. To be known as research institute rather than only academic institute. Create bridges between industrial and in house products. To meet the huge requirement of local, national and international engineering industry. To be accredited by NBA and other educational association. To be a Deemed University. 8/1/2016 3Ms. Disha Singh/HOD/ECE
  • 4.
    Previous Session Achievements: 100%result in 8th semester with highest SGPA of 9.25. Abhijeet Singh, [ECE 2012-16 batch] got selected as captain in Indian Airforce. Sunil Jhangeela [ECE 2012-2016 batch] got selected as Sub Inspector. STEP program was conducted successfully. 8/1/2016 4Ms. Disha Singh/HOD/ECE
  • 5.
    Action Plan: (a)Syllabus completion Syllabus progress report to be submitted to the HOD after every 15 days . Student feedback on the quality of teaching learning to be monitored on 07/09/16, 30/09/16, 11/11/16 by the HOD. 8/1/2016 5Ms. Disha Singh/HOD/ECE
  • 6.
    Action Plan: (b) ResultsImprovement  Orientation program [28th July-29th July, 2016]  Bridge courses for higher semester[1st Aug-10th Aug, 2016] Preparation of notes/course material from multiple references. [On or before 30th July, 2016.] Introducing “Open Source Exam” and “Surprise Test” [During last fortnight of September.] Fruitful use of digital library viz. NPTEL, Stanford Lectures, MIT open course etc. [Video lecture downloading completed for few subjects. Materials will be supplied to students on or before 31st Aug, 2016. Class teacher will monitor this.] Introducing multiple Q&A during every planed session. Prepare model answer sheet for previous year paper/assignment/mock tests, after completion of every unit. Planed schedule for MST 1(19/09/16-21/09/16), MST 2 (13/10/16- 15/10/16), PUT (07/11/16-11/11/16)  Display of Model answer sheet(PUT) 15/11/16. 8/1/2016 6Ms. Disha Singh/HOD/ECE
  • 7.
    Action Plan: (c)Skills Development Breadboarddesigning study [20/08/16] GD/ PI Session [27/08/16] Introduction to Microcontroller and microprocessor. [17/09/16] Technical interview session [24/09/16] Expert lecture on 26/9/16 by Mr. Raja Namdeo on Advance Comm. Expert lecture on 21/11/16 by Mr. Utsav Malviya on Projects & Industrial relevance. 8/1/2016 7Ms. Disha Singh/HOD/ECE
  • 8.
    Action Plan: (d) STEP 6hours per week. [Incorporated already]. Preparation of daily lesson plan and material . [on or before 30th of July, 2016] 3rd Sem – Introduction to MATLAB (16/08/16 onwards) by Mr. Salil Jain  5th Sem – Advanced MATLAB (02/08/16 onwards) by Mr. Suryabhan Singh 7th Sem – Arduino (02/08/16 onwards) by Mr. U.N Bera. Checking the availability of the software in the CP Lab and update the license in each computer. [before 25th July, 2016] Strictly monitor the attendance. [Once in a fortnight] Course material should be focused on recent trends and emerging technology. [Monitored by HOD. [Once in a fortnight] 8/1/2016 8Ms. Disha Singh/HOD/ECE
  • 9.
    Action Plan: (e)Research andPublication Taking membership of professional society like IET, IEEE, ASME etc. [Application- 15th Sept, 2016] Progress seminar once in a month about recent development. Selecting one or two major fields per faculty. [On or before 15th of August.] Minimum 1 publication in three month. [Major review should be answered and revised at lest. [On or before 15th Oct, 2016] Fruitful use of library journal subscriptions. [Every fortnight reporting.] 8/1/2016 9Ms. Disha Singh/HOD/ECE
  • 10.
    Action Plan: (f) IndustrialVisit Optical fiber lab, GSM , 3G, 4G lab (BSNL-TTC, Jabalpur) [10/09/16] Bargi Hydel Power Plant , Jabalpur [08/10/16] 8/1/2016 10Ms. Disha Singh/HOD/ECE
  • 11.
    Action Plan: (g) Tech-Fest Project Every faculty has to undertake at least 1 SIE(Social innovation and Entrepreneurship). Event(Tech- fest) is scheduled for March – April 2017 . Need to propose the project details on or before 26/10/16 Active participation on various others events of tech- fest. 8/1/2016 11Ms. Disha Singh/HOD/ECE
  • 12.
    Action Plan: (h) Training& Placement Individual placement coordinator for dept. [formation of cell by 20th August, 2016] Conduct mock interview.[Every Monday and Tuesday by TPO 2016] Conduct mock GD and Aptitude class. [Every Monday and Tuesday by TPO 2016] 1 hour course on attractive Resume making. [27th August, 2016] Provide various resource like freashersword.com, naukri.com for previous year sample placement paper. [Material Ready] 8/1/2016 12Ms. Disha Singh/HOD/ECE
  • 13.
    Action Plan: (i) Projects Introducing“Course Projects”. [List of activity is mentioned on Course files. (On or before 15th August. 2016)] Preparation of project reference copy and synopsis for every faculty per project group.[On or before 24th July, 2016] Establish the culture of “Progress Seminar” at least once in a month. [Valid for final year students. Guide will monitor the action. HOD look after all the activity.] [Review dates 14th sep and 25th oct, 2016]. Fruitful use YouTube Channel and other internet sources but in the same time keep the copyright matter under strict supervision [Before submission of the printed project report. [Nov 1st week]]. Internal assessment of the projects. Create a panel of faculty with same field interest. Rigorous comments and criticism. [ 10th Sept, 20th Oct] Standardize thesis format. [Done] 8/1/2016 13Ms. Disha Singh/HOD/ECE
  • 14.
    Action Plan: (j) LABReadiness Strictly monitor by class teacher/course teacher along with TA. [[Everyday]] Conduct Lab Viva, journal checking on daily basis. [checked by HOD] Lab can be useful for whole day and it will provide maximum support to the students to complete their course projects/minor projects/major projects. [Everyday] After demonstration of TA/Faculty, students will have to perform the experiment individually and TA should monitor the safety measure. [[Everyday]] 8/1/2016 14Ms. Disha Singh/HOD/ECE
  • 15.
    Action Plan: (k) ShortTerm Course Once in a month. Lesson plan properly made and course contents will be circulated. The following are the course name of STC  PLC [August] Matlab [NN tool] [September] Arduino [September] ANSYS [October] 8/1/2016 15Ms. Disha Singh/HOD/ECE
  • 16.
    Action Plan: (l) ExtraCurriculum Activities Society and clubs formation.  Robotics Society [Done] Tech-fest participation at various IITs, IIITs and NITs. [U N Bera] Re-establishment of CARE [Control, Automation, Robotics Engineering] Club. [Done] Society/club having own information uploaded in the website along with its activities. All the activities will be reported to The PRINCIPAL. [30th August, 2016] Provide various resource like freashersword.com, naukri.com for previous year sample placement paper. [Done] Successfully completion of academic calendar targets. [Nov 2016] 8/1/2016 16Ms. Disha Singh/HOD/ECE
  • 17.
    Thank You 8/1/2016 17Ms.Disha Singh/HOD/ECE