95 Excel Tips & Tricks
TO MAKE YOU AWESOME AT WORK

by
PURNA DUGGIRALA

95 Excel Tips to Make you awesome

1

http://chandoo.org/wp/
95 Excel Tips & Tricks
To make you awesome at work

by Purna Duggirala
http://chandoo.org/wp

© 2012 by Chandoo.org

You have permission to post this, email this, print this and pass it along for free
to anyone you like, as long as you make no changes or edits to its contents or
digital format. In fact, I’d love it if you’d make lots and lots of copies. Don’t just
go and bind this book and start selling it; that right is still with me.

You can find all these tips and hundreds more tricks at http://chandoo.org/wp
www.chandoo.org

95 Excel Tips to Make you awesome

2

http://chandoo.org/wp/
STEAL THIS BOOK!
Grab the chance to steal this book. Here is what you can do to spread this book.
1. Send the file to a colleague or friend.
2. Send them a link to http://chandoo.org/wp/subscribe so that they can download it.
3. Print out as many copies as you like.

95 Excel Tips to Make you awesome

3

http://chandoo.org/wp/
What is in this book?
Excel Keyboard Shortcuts................................................................................................... 5
Excel Formulas for Everyday Situations ............................................................................ 9
Day to Day Excel Usage ..................................................................................................... 6
Excel Charting Tips & Tweaks ........................................................................................... 7
Follow These 6 Steps for Better Chart Formatting ............................................................. 8
Know these 15 Powerful Excel Formulas ........................................................................... 9
15 Ways to Have Fun with Excel ..................................................................................... 17
Know How to Paste Your Data – 7 Tricks ....................................................................... 23

95 Excel Tips to Make you awesome

4

http://chandoo.org/wp/
Excel Keyboard Shortcuts

1

During formula typing, adjusts the reference
type, abs to relative, otherwise repeats last
action

2

Inserts current date

3

Copies value from cell above to current cell

4

Edits a cell comment

5

Opens macro dialog box

6

Auto sum selected cells and places value in
cell beneath

7

Currency formats current cell

8

Applies outline border to selected cells

9

Comma formats current cell

10

Activates font drop down list

11

Activates font point size drop down list

More: Comprehensive list of Keyboard Shortcuts in Excel

95 Excel Tips to Make you awesome

5

http://chandoo.org/wp/
Day to Day Excel Usage
1. To format a number as SSN, use the custom format code “000-00-0000″… Get Full
Tip
2. To format a phone number, use the custom format code “000-000-0000″… Get Full
Tip
3. To show values after decimal point only when number is less than one, use
[<1]_($#,##0.00_);_($#,##0_) as formatting code… Get Full Tip
4. To hide a worksheet, go to menu > format > sheet > hide… Get Full Tip
5. To align multiple objects, like charts, drawings, pictures use drawing toolbar > align
and select alignment option… Get Full Tip
6. To disable annoying formula errors, go to menu > tools > options > error checking
tab and disable errors you don’t want to see… Get Full Tip
7. To transpose a range of cells, copy the cells, go to empty area, and press alt+e+s+e…
Get Full Tip
8. To save data filter settings so that you can reuse them again, use custom views… Get
Full Tip
9. To select all formulas, press CTRL+G, select “special” and check “formulas”
10. To select all constants, press CTRL+G, select “special” and check “constants”
11. To clear formats from a range, select menu > edit > clear > “formats”
12. To move a chart and align it with cells, hold down ALT key while moving the chart

95 Excel Tips to Make you awesome

6

http://chandoo.org/wp/
Excel Charting Tips & Tweaks
1. To create an instant micro-chart from your normal chart, use camera tool… Get
Full Tip
2. Understand data to ink ratio to reduce chart junk, using even a pixel more of ink
than what is needed can reduce your chart’s effectiveness
3. Combine two different types of charts when one is not enough, to use, add another
series of data to your sheet and then right click on it and change the chart type… Get
Full Tip
4. To reverse the order of items in a bar / column chart, just click on y-axis, press
ctrl+1, and check “categories in reverse order” and “x-axis crosses at maximum
category” options
5. To change the marker symbol or bubble in a chart to your own favorite shape,
just draw any shape in worksheet using drawing toolbar, then copy it by pressing
ctrl+c, now go to the chart and select markers (or bubbles) and press ctrl+v
6. To create partially overlapped column / bar charts just use overlap and gap
settings in the format data series area. A overlap of 100 will completely overlap one
series on another, while 0 separates them completely.… Get Full Tip
7. To increase the contrast of your chart, just remove grayish background color that
excel adds to the chart (in versions excel 2003 and prior)
8. To save yourself some trouble, always try to avoid charts like - 3D area charts (unstacked), radar charts, 3D Lines, 3D Columns with multiple series of data, Donut
charts with more than 2 series of data… Get Full Tip
9. To improve comparison, replace your radar charts with tables… Get Full Tip
More: Excel Charting Tips & Tutorials

95 Excel Tips to Make you awesome

7

http://chandoo.org/wp/
Follow These 6 Steps for Better Chart Formatting

1. Remove any vertical grid-lines
2. Change horizontal grid-line color from black to a very light shade of gray
3. Adjust chart series colors to get better contrast
4. Adjust font scaling (for versions excel 2003 and prior)
5. Add data labels and remove any axis (axis labels) if needed
6. Remove chart background colors

95 Excel Tips to Make you awesome

8

http://chandoo.org/wp/
Excel Formulas for Everyday Situations
1. To get the first name of a person, use =left(name, find(“ “,name)-1)
2. To calculate mortgage payments, use =PMT(interest-rate, number-ofpayments, how-much-loan)
3. To get nth largest number in a range, use =large(range, n)… Get Full Tip
4. To get nth smallest number in a range, use = small(range, n)… Get Full
Tip
5. To generate a random phone number, use
=randbetween(1000000000,9999999999), needs analysis tool pack if you
are using excel 2003 or earlier… Get Full Tip
6. To count number of words in a cell, use =len(trim(text))len(SUBSTITUTE(trim(text),” “,”"))… Get Full Tip
7. To count positive values in a range, use =countif(range,”>0″)… Get Full
Tip
8. To calculate weighted average, use SUMPRODUCT() function
9. To remove unnecessary spaces, use =trim(text)
10. To format a number as SSN using formulas, use =text(ssn-text,”000-000000″)… Get Full Tip
11. To find age of a person based on DOB, use =TEXT((NOW()birth_date)&”",”yy “”years”" m “”months”" dd “”days”"”),
output will be like 27 years 7 months 29 days
12. To get name from initials from a name, use IF(), FIND(), LEN() and
SUBSTITUTE() formulas… Get Full Tip
13. To get proper fraction from a number (for eg 1/3 from 6/18), use
=text(fraction, “?/?”)
14. To get partial matches in vlookup, use * operator like this:
=vlookup(”abc*”,lookup_range,return_column)
15. To simulate averageif() in earlier versions of excel, use =sumif(range,
criteria)/countif(range, criteria)
95 Excel Tips to Make you awesome

9

http://chandoo.org/wp/
16. To debug your formulas, select the portions of formula and press F9 to see the result
of that portion… Get Full Tip
17. To get the file extension from a file name, use =right(filename,3) (doesn’t
work for files that have weird extensions like .docx, .htaccess etc.)
18. To quickly insert an in cell micro-chart, use REPT() function… Get Full Tip
19. COUNT() only counts number of cells with numbers in them, if you want to count
number of cells with anything in them, use COUNTA()
20. Using named ranges in formulas saves you a lot of time. To define one, just select
some cells, and go to menu > insert > named ranges > define

More: Excel formula tips & tutorials

95 Excel Tips to Make you awesome

10

http://chandoo.org/wp/
Know these 15 Powerful Excel Formulas
Excel formulas can always be very handy, especially when you are stuck with data and
need to get something done fast. But how well do you know the spreadsheet formulas?
Discover these 15 extremely powerful excel formulas and save a ton of time next
time you open that spreadsheet.
1. Change the case of cell contents - to UPPER, lower, Proper
Boss wants a report of top 100 customers, thankfully you have the data, but the
customer names are all in lower cases. Fret not, you can Proper Case cell contents
with proper() formula.
Example: Use proper("become awesome in excel") to get Become Awesome In
Excel
Also try lower() and upper() as well to change excel cell value to lower and
UPPER case
2. Clean up textual data with trim, remove trailing spaces
Often when you copy data from other sources, you are bound to get lots of empty
spaces next to each cell value. You can clean up cell contents with trim() spreadsheet
function.
Example: Use trim(" copied data ") to get copied data
3. Extract characters from left, right or center of a given text
Need the first 5 numbers of that SSN or area code from that phone number? You can
command excel to do that with left() function.
Example: Use left("Hi Beautiful!",2) to get Hi
Also try right(text, no. of chars) and mid(text, start, no. of chars) to
get rightmost or middle characters. You can use right(filename,3) to get the
extension of a file name
4. Find second, third, fourth element in a list without sorting
We all know that you can use min(), max() to find the smallest and largest numbers in
a list. But what if you needed the second smallest number or 3rd largest number in the
95 Excel Tips to Make you awesome

11

http://chandoo.org/wp/
list? You are right, there is a spreadsheet function to exactly that.
Example: Use SMALL({10,9,12,14,26,13,4,6,8},3) to get 8

Also try large(list, n) to get the nth largest number in a list.
5. Find out current date, time with a snap
You have a list of customer orders and you want to findout which ones are due for
shipping after today. The funny thing is you do this everyday. So instead of entering
the date every single day you can use today()
Example: Use today() to get 08/13/2008 or whatever is today’s date
Also try now() to get current time in date time format. Remember, you can always
format these date and times to see them the way you like (for eg. Aug-13, August 13,
2008 instead of 08/13/2008)
6. Convert those lengthy nested if functions to one simple formula

with Choose()
Planning to create a grade book or something using excel, you are bound to write
some if() functions, but do you know that you can use choose() when you have more
than 2 outcomes for a given condition? As you all know, if(condition, fetch
this, or this) returns “fetch this” if the condition is TRUE or “or this” if the
condition is FALSE. Learn more about spreadsheet if functions like countif, sumif
etc.
Where as choose(m, value1, value2, value3, value4 ...) can return any of
the value1,2.., based on the parameter m.
Example: Use CHOOSE(3,"when","in","doubt","just","choose")
to get doubt
Remember, you can always write another formula for each of the n parameters of
choose() so that based on input condition (in this case 3), another formula is
evaluated.
95 Excel Tips to Make you awesome

12

http://chandoo.org/wp/
7. Repetitively print a character in a cell n number of times
You have the ZIP codes of all your customers in a list and planning to upload it to an
address label generation tool. The sad part is for some reason, excel thinks zip codes
are numbers, so it removed all the trailing zeros on the leftside of the zip code, thus
making the 01001 as 1001. Worry not, you can use rept() the extra needed zeros.
You can also custom format cell contents to display zip codes, phone numbers, ssn
etc.
Example: Use zipcode & REPT("0",5-LEN(zipcode)) to convert zipcode 1001 to
01001
You can use REPT("|",n) to generate micro bar charts in your sheet. Learn more
about incell charting.
8. Find out the data type of cell contents
This can be handy when you are working off the data that someone
else has created. For example you may want to capitalize if the
contents are text, make it 5 characters if its a number and leave it
as it is otherwise for certain cell value. Type() does just that, it tells
what type of data a cell is containing.
Example: Use TYPE("Chandoo") to get 2
See the various type return values in the diagram shown right.
9. Round a number to nearest even, odd number
When you are working with data that has fractions / decimals, often you may need to
find the nearest integer, even or odd number to the given decimal number. Thankfully
excel has the right function for this.
Example: Use ODD(63.4) to get 65
Also try even() to nearest even number and int() to round given fraction to integer just
below it.
Example: Use EVEN(62.4) to get 64
Use INT(62.99) to get 62
If you need to round off a given fraction to nearest integer you can use
round(62.65,0) to get 63.

95 Excel Tips to Make you awesome

13

http://chandoo.org/wp/
10. Generate random number between any 2 given numbers
When you need a random number between any two numbers, try randbetween(), it is
very useful in cases where you may need random numbers to simulate some behavior
in your spreadsheets.
Example: Use RANDBETWEEN(10,100) may return 47 if you keep trying
11. Convert pounds to KGs, meters to yards and tsps to table spoons
You need not ask Google if you need to convert 156 lbs to kilograms or find out how
much 12 tea spoons of olive oil actually means. The hidden convert() function is
really versatile and can convert many things to so many other things, except one
currency to another, of course.

Example: Use CONVERT(150,"lbm","kg") to convert 150 lbs to 68.03 kgs.
Use CONVERT(12,"tsp","oz") to findout that 12 tsps is actually 2 ounces.
12. Instantly calculate loan installments using spreadsheet formula
You have your eyes on that beautiful car or beach property, but before visiting the
seller / banker to findout of the monthly payment details, you would like to see how
much your monthly / biweekly loan payments would be. Thankfully excel has the
right formula to divide an amount to equal payment installments over given time
period, the pmt() function.

95 Excel Tips to Make you awesome

14

http://chandoo.org/wp/
If your loan amount is $125,000,
APR (interest rate per year) is 6%,
loan tenure is 5 years and
payments are made every month, then,
Use PMT(6%/12,5*12,-125000) which tells us that monthly payment is $ 2,416 if
you keep trying
Also, if you want to find out how much of each payment is going for principle and
how much for the interest component, try using ppmt() and ipmt() functions. As you
can guess, even though EMIs or loan installments remain constant, the amount
contributed to principle and interest vary each month.
13. What is this week’s number in the current year?
Often you may need to find out if the current week is 25th week of this year. This is
not so difficult to find as it may seem. Again, excel has the right function to do just
that.
Example: Use WEEKNUM(TODAY()) will get 33
14. Find out what is the date after 30 working days from today?
Finding out a future date after 30 days from today is easy, just change the month. But
what if you need to know the date thirty working days from now. Don’t use your
fingers to do that counting, save them for typing a comment here and use the
workday() excel function instead.
Example: Use WORKDAY(TODAY(),30) tells that Sep 24, 2008 is 30 working days
away from today.
If you want to find out number of working days between 2 dates you can use
networkdays() function, find out this and a 14 other fun things you can do with excel.
15. With so many functions, how to handle errors
Once you get to the powerful domain of excel functions to simplify your work, you
are bound to have incorrect data, missing cells etc. that can make your formulas go
kaput. If only there is a way to find out when a formula throws up error, you can
handle it. Well, you know what, there is a way to find out if a cell has an error or a
proper value. iserror() MS Excel function tells you when a cell has error.
Example: Use ISERROR(43/0) returns TRUE since 43 divided by zero throws divide
by zero error.
95 Excel Tips to Make you awesome

15

http://chandoo.org/wp/
Also try ISNA() to find out if a cell has NA error (Not applicable).
Give these functions a try, simplify your work and enjoy

More: Advanced Formula Examples & Explanations

95 Excel Tips to Make you awesome

16

http://chandoo.org/wp/
15 Ways to Have Fun with Excel

Who said Excel takes lot of time / steps do something? Here is a list of 15 incredibly fun
things you can do to your spreadsheets and each takes no more than 5 seconds to do.

1. Change the shape / color of cell comments

Just select the cell comment, go to draw menu in bottom left corner of the screen, and
choose change auto shape option, select a 32 pointed star or heart symbol or a smiley
face, just wow everyone

2. Filter unique items from a list

Select the data, go to data > filter > advanced filter and check the “unique items” option.

95 Excel Tips to Make you awesome

17

http://chandoo.org/wp/
3. Sort from Left to Right

What if your data flows from left to right instead of top to bottom? Just change the sort
orientation from “sort options” in the data > sort menu.

4. Hide the grid lines from your sheets

Go to Options dialog in tools menu, uncheck the “grid lines” option to remove gridlines
from your worksheets. You can also change the color of grid line from here (not
recommended)

5. Add rounded border to your charts, make them look smooth

95 Excel Tips to Make you awesome

18

http://chandoo.org/wp/
Just right click on the chart, select format chart option, in the dialog, check the “rounded
borders”. You can even add a shadow effect from here.

6. Fetch live stock quotes / company research with one click

Just enter the stock symbol (MSFT, GOOG, AAPL etc.) in a cell, alt+click on the cell to
launch “research pane”, select stock quotes to see MSN Money quotes for the selected
symbol. You can fetch company profiles in the same way. Learn more.

7. Repeat rows on top when printing, show table headers on every
page

When you are on the sheet view, just hit menu > file > page setup, go to the last tab,
specify “rows to repeat”. You can “repeat columns while printing” as well from the same
menu.

8. Remove conditional formatting / all formatting with one click

95 Excel Tips to Make you awesome

19

http://chandoo.org/wp/
Just go to Menu > Edit > Clear > All to remove all the formatting from selected cell /
range.

9. Auto sum cells with one click

Select a bunch of cells and click on the Sigma symbol on the standard tool bar.
Alternatively you can use Alt+= keyboard shortcut.

10. Find width of a column with formula, really!

Just use =cell("width") to find the width of the column to which that formula cell
belongs. Width is returned as the nearest integer.

11. Find total working days between any two dates, including
holidays

95 Excel Tips to Make you awesome

20

http://chandoo.org/wp/
If you work on project plans, gantt charts alot, this can be totally handy. Just type
=networkdays(start date, end date, list of holidays) to fetch the number of
working days. In the above sample you can see the number of working days between
New years day and September first of this year (labor day).

12. Freeze Rows / Columns in your sheet, Show important info even
when scrolling

Select the cell diagonally beneath the row / columns you want to freeze (for eg. if you
wan to freeze row 1&2 and columns A&B, click in C3), go to menu > window and click
on freeze panes.

13. Split sheets in to two, compare side by side to be more productive

Just click on this little vertical bar on the bottom right corner of the sheet (see below) and
drag it to create a vertical split. You can do the same way for a horizontal split as well

95 Excel Tips to Make you awesome

21

http://chandoo.org/wp/
14. Change the color of various sheet name tabs

Right click on sheet and select “Tab color” option to change the worksheet tab colors.
Group them with similar colors if you have lot of sheets, it looks nice.

15. Insert a quick organization chart

Click on menu > insert > diagram to open the above dialog, just select
the organization chart option, enter node values and you have a pretty
organization chart. Alternatively learn how to create org charts in
excel.

95 Excel Tips to Make you awesome

22

http://chandoo.org/wp/
Know How to Paste Your Data – 7 Tricks

1. Paste Formats (or Format painter)
Like that sleek table format your colleague has made? But
don’t have the time to redo it yourself, worry not, you can
paste formatting (including any conditional formats) from
any copied cells to new cells, just hit ALT+E S T.

2. Paste Formulas
If you want to copy a bunch of formulas to a new range of cells - this is very useful. Just
copy the cells containing the formulas, hit ALT+E S F. You can achieve the same effect
by dragging the formula cell to new range if the new range is adjacent.

3. Paste Validations
Love copy those input validations you have created
but not the cell contents or anything, just press
ALT+E S N. This is very useful when you created a
form and would like to replicate some of the cells to
another area.

4. Adjust column widths of some cells based on other cells
You have created a table for tracking purchases and your boss liked it. So he wanted you
to create another table to track sales and you want to maintain the column widths in the
new table. You dont have to move back and forth looking for column widths or anything.
Instead just paste column widths from your selection. Use ALT+E S W.

5. Grab comments only and paste them elsewhere
If you want to copy comments alone from certain cells
to a new set of cells, just use ALT + E S C. This will
reduce the amount of retyping you need to do.

95 Excel Tips to Make you awesome

23

http://chandoo.org/wp/
6. Add while pasting
For example, if you have in Row 1 - 1 2 3 as
values and in Row 2 - 7 8 9 as values and you
would like to add row 1 values to row 2 values to
get - 8 10 12, you can do this using paste special.
Just copy row 1 values and use ALT + E S D.

7. Paste links to other cells
If you want to create references to a bulk of cells instead of copy-pasting all the values
this is the option for you. Just use ALT+E S L to create an automatic reference to copied
range of cells.

95 Excel Tips to Make you awesome

24

http://chandoo.org/wp/
Want to learn more?
Consider joining our Excel training programs

Become awesome in Excel &
Dashboards with online classes
from Chandoo.org.

Use VBA & Macros like a pro by
joining our online training
program.

Click here to know more

Click here to know more

95 Excel Tips to Make you awesome

25

http://chandoo.org/wp/
STEAL THIS BOOK!
Grab the chance to steal this book. Here is what you can do to spread this book.
1. Send the file to a colleague or friend.
2. Send them a link to http://chandoo.org/wp/subscribe so that they can download it.
3. Print out as many copies as you like.

95 Excel Tips to Make you awesome

26

http://chandoo.org/wp/
something

Thank you for reading
95 Excel Tips & Tricks
For more tips, visit

95 Excel Tips to Make you awesome

27

http://chandoo.org/wp/

95 exceltipsv4

  • 1.
    95 Excel Tips& Tricks TO MAKE YOU AWESOME AT WORK by PURNA DUGGIRALA 95 Excel Tips to Make you awesome 1 http://chandoo.org/wp/
  • 2.
    95 Excel Tips& Tricks To make you awesome at work by Purna Duggirala http://chandoo.org/wp © 2012 by Chandoo.org You have permission to post this, email this, print this and pass it along for free to anyone you like, as long as you make no changes or edits to its contents or digital format. In fact, I’d love it if you’d make lots and lots of copies. Don’t just go and bind this book and start selling it; that right is still with me. You can find all these tips and hundreds more tricks at http://chandoo.org/wp www.chandoo.org 95 Excel Tips to Make you awesome 2 http://chandoo.org/wp/
  • 3.
    STEAL THIS BOOK! Grabthe chance to steal this book. Here is what you can do to spread this book. 1. Send the file to a colleague or friend. 2. Send them a link to http://chandoo.org/wp/subscribe so that they can download it. 3. Print out as many copies as you like. 95 Excel Tips to Make you awesome 3 http://chandoo.org/wp/
  • 4.
    What is inthis book? Excel Keyboard Shortcuts................................................................................................... 5 Excel Formulas for Everyday Situations ............................................................................ 9 Day to Day Excel Usage ..................................................................................................... 6 Excel Charting Tips & Tweaks ........................................................................................... 7 Follow These 6 Steps for Better Chart Formatting ............................................................. 8 Know these 15 Powerful Excel Formulas ........................................................................... 9 15 Ways to Have Fun with Excel ..................................................................................... 17 Know How to Paste Your Data – 7 Tricks ....................................................................... 23 95 Excel Tips to Make you awesome 4 http://chandoo.org/wp/
  • 5.
    Excel Keyboard Shortcuts 1 Duringformula typing, adjusts the reference type, abs to relative, otherwise repeats last action 2 Inserts current date 3 Copies value from cell above to current cell 4 Edits a cell comment 5 Opens macro dialog box 6 Auto sum selected cells and places value in cell beneath 7 Currency formats current cell 8 Applies outline border to selected cells 9 Comma formats current cell 10 Activates font drop down list 11 Activates font point size drop down list More: Comprehensive list of Keyboard Shortcuts in Excel 95 Excel Tips to Make you awesome 5 http://chandoo.org/wp/
  • 6.
    Day to DayExcel Usage 1. To format a number as SSN, use the custom format code “000-00-0000″… Get Full Tip 2. To format a phone number, use the custom format code “000-000-0000″… Get Full Tip 3. To show values after decimal point only when number is less than one, use [<1]_($#,##0.00_);_($#,##0_) as formatting code… Get Full Tip 4. To hide a worksheet, go to menu > format > sheet > hide… Get Full Tip 5. To align multiple objects, like charts, drawings, pictures use drawing toolbar > align and select alignment option… Get Full Tip 6. To disable annoying formula errors, go to menu > tools > options > error checking tab and disable errors you don’t want to see… Get Full Tip 7. To transpose a range of cells, copy the cells, go to empty area, and press alt+e+s+e… Get Full Tip 8. To save data filter settings so that you can reuse them again, use custom views… Get Full Tip 9. To select all formulas, press CTRL+G, select “special” and check “formulas” 10. To select all constants, press CTRL+G, select “special” and check “constants” 11. To clear formats from a range, select menu > edit > clear > “formats” 12. To move a chart and align it with cells, hold down ALT key while moving the chart 95 Excel Tips to Make you awesome 6 http://chandoo.org/wp/
  • 7.
    Excel Charting Tips& Tweaks 1. To create an instant micro-chart from your normal chart, use camera tool… Get Full Tip 2. Understand data to ink ratio to reduce chart junk, using even a pixel more of ink than what is needed can reduce your chart’s effectiveness 3. Combine two different types of charts when one is not enough, to use, add another series of data to your sheet and then right click on it and change the chart type… Get Full Tip 4. To reverse the order of items in a bar / column chart, just click on y-axis, press ctrl+1, and check “categories in reverse order” and “x-axis crosses at maximum category” options 5. To change the marker symbol or bubble in a chart to your own favorite shape, just draw any shape in worksheet using drawing toolbar, then copy it by pressing ctrl+c, now go to the chart and select markers (or bubbles) and press ctrl+v 6. To create partially overlapped column / bar charts just use overlap and gap settings in the format data series area. A overlap of 100 will completely overlap one series on another, while 0 separates them completely.… Get Full Tip 7. To increase the contrast of your chart, just remove grayish background color that excel adds to the chart (in versions excel 2003 and prior) 8. To save yourself some trouble, always try to avoid charts like - 3D area charts (unstacked), radar charts, 3D Lines, 3D Columns with multiple series of data, Donut charts with more than 2 series of data… Get Full Tip 9. To improve comparison, replace your radar charts with tables… Get Full Tip More: Excel Charting Tips & Tutorials 95 Excel Tips to Make you awesome 7 http://chandoo.org/wp/
  • 8.
    Follow These 6Steps for Better Chart Formatting 1. Remove any vertical grid-lines 2. Change horizontal grid-line color from black to a very light shade of gray 3. Adjust chart series colors to get better contrast 4. Adjust font scaling (for versions excel 2003 and prior) 5. Add data labels and remove any axis (axis labels) if needed 6. Remove chart background colors 95 Excel Tips to Make you awesome 8 http://chandoo.org/wp/
  • 9.
    Excel Formulas forEveryday Situations 1. To get the first name of a person, use =left(name, find(“ “,name)-1) 2. To calculate mortgage payments, use =PMT(interest-rate, number-ofpayments, how-much-loan) 3. To get nth largest number in a range, use =large(range, n)… Get Full Tip 4. To get nth smallest number in a range, use = small(range, n)… Get Full Tip 5. To generate a random phone number, use =randbetween(1000000000,9999999999), needs analysis tool pack if you are using excel 2003 or earlier… Get Full Tip 6. To count number of words in a cell, use =len(trim(text))len(SUBSTITUTE(trim(text),” “,”"))… Get Full Tip 7. To count positive values in a range, use =countif(range,”>0″)… Get Full Tip 8. To calculate weighted average, use SUMPRODUCT() function 9. To remove unnecessary spaces, use =trim(text) 10. To format a number as SSN using formulas, use =text(ssn-text,”000-000000″)… Get Full Tip 11. To find age of a person based on DOB, use =TEXT((NOW()birth_date)&”",”yy “”years”" m “”months”" dd “”days”"”), output will be like 27 years 7 months 29 days 12. To get name from initials from a name, use IF(), FIND(), LEN() and SUBSTITUTE() formulas… Get Full Tip 13. To get proper fraction from a number (for eg 1/3 from 6/18), use =text(fraction, “?/?”) 14. To get partial matches in vlookup, use * operator like this: =vlookup(”abc*”,lookup_range,return_column) 15. To simulate averageif() in earlier versions of excel, use =sumif(range, criteria)/countif(range, criteria) 95 Excel Tips to Make you awesome 9 http://chandoo.org/wp/
  • 10.
    16. To debugyour formulas, select the portions of formula and press F9 to see the result of that portion… Get Full Tip 17. To get the file extension from a file name, use =right(filename,3) (doesn’t work for files that have weird extensions like .docx, .htaccess etc.) 18. To quickly insert an in cell micro-chart, use REPT() function… Get Full Tip 19. COUNT() only counts number of cells with numbers in them, if you want to count number of cells with anything in them, use COUNTA() 20. Using named ranges in formulas saves you a lot of time. To define one, just select some cells, and go to menu > insert > named ranges > define More: Excel formula tips & tutorials 95 Excel Tips to Make you awesome 10 http://chandoo.org/wp/
  • 11.
    Know these 15Powerful Excel Formulas Excel formulas can always be very handy, especially when you are stuck with data and need to get something done fast. But how well do you know the spreadsheet formulas? Discover these 15 extremely powerful excel formulas and save a ton of time next time you open that spreadsheet. 1. Change the case of cell contents - to UPPER, lower, Proper Boss wants a report of top 100 customers, thankfully you have the data, but the customer names are all in lower cases. Fret not, you can Proper Case cell contents with proper() formula. Example: Use proper("become awesome in excel") to get Become Awesome In Excel Also try lower() and upper() as well to change excel cell value to lower and UPPER case 2. Clean up textual data with trim, remove trailing spaces Often when you copy data from other sources, you are bound to get lots of empty spaces next to each cell value. You can clean up cell contents with trim() spreadsheet function. Example: Use trim(" copied data ") to get copied data 3. Extract characters from left, right or center of a given text Need the first 5 numbers of that SSN or area code from that phone number? You can command excel to do that with left() function. Example: Use left("Hi Beautiful!",2) to get Hi Also try right(text, no. of chars) and mid(text, start, no. of chars) to get rightmost or middle characters. You can use right(filename,3) to get the extension of a file name 4. Find second, third, fourth element in a list without sorting We all know that you can use min(), max() to find the smallest and largest numbers in a list. But what if you needed the second smallest number or 3rd largest number in the 95 Excel Tips to Make you awesome 11 http://chandoo.org/wp/
  • 12.
    list? You areright, there is a spreadsheet function to exactly that. Example: Use SMALL({10,9,12,14,26,13,4,6,8},3) to get 8 Also try large(list, n) to get the nth largest number in a list. 5. Find out current date, time with a snap You have a list of customer orders and you want to findout which ones are due for shipping after today. The funny thing is you do this everyday. So instead of entering the date every single day you can use today() Example: Use today() to get 08/13/2008 or whatever is today’s date Also try now() to get current time in date time format. Remember, you can always format these date and times to see them the way you like (for eg. Aug-13, August 13, 2008 instead of 08/13/2008) 6. Convert those lengthy nested if functions to one simple formula with Choose() Planning to create a grade book or something using excel, you are bound to write some if() functions, but do you know that you can use choose() when you have more than 2 outcomes for a given condition? As you all know, if(condition, fetch this, or this) returns “fetch this” if the condition is TRUE or “or this” if the condition is FALSE. Learn more about spreadsheet if functions like countif, sumif etc. Where as choose(m, value1, value2, value3, value4 ...) can return any of the value1,2.., based on the parameter m. Example: Use CHOOSE(3,"when","in","doubt","just","choose") to get doubt Remember, you can always write another formula for each of the n parameters of choose() so that based on input condition (in this case 3), another formula is evaluated. 95 Excel Tips to Make you awesome 12 http://chandoo.org/wp/
  • 13.
    7. Repetitively printa character in a cell n number of times You have the ZIP codes of all your customers in a list and planning to upload it to an address label generation tool. The sad part is for some reason, excel thinks zip codes are numbers, so it removed all the trailing zeros on the leftside of the zip code, thus making the 01001 as 1001. Worry not, you can use rept() the extra needed zeros. You can also custom format cell contents to display zip codes, phone numbers, ssn etc. Example: Use zipcode & REPT("0",5-LEN(zipcode)) to convert zipcode 1001 to 01001 You can use REPT("|",n) to generate micro bar charts in your sheet. Learn more about incell charting. 8. Find out the data type of cell contents This can be handy when you are working off the data that someone else has created. For example you may want to capitalize if the contents are text, make it 5 characters if its a number and leave it as it is otherwise for certain cell value. Type() does just that, it tells what type of data a cell is containing. Example: Use TYPE("Chandoo") to get 2 See the various type return values in the diagram shown right. 9. Round a number to nearest even, odd number When you are working with data that has fractions / decimals, often you may need to find the nearest integer, even or odd number to the given decimal number. Thankfully excel has the right function for this. Example: Use ODD(63.4) to get 65 Also try even() to nearest even number and int() to round given fraction to integer just below it. Example: Use EVEN(62.4) to get 64 Use INT(62.99) to get 62 If you need to round off a given fraction to nearest integer you can use round(62.65,0) to get 63. 95 Excel Tips to Make you awesome 13 http://chandoo.org/wp/
  • 14.
    10. Generate randomnumber between any 2 given numbers When you need a random number between any two numbers, try randbetween(), it is very useful in cases where you may need random numbers to simulate some behavior in your spreadsheets. Example: Use RANDBETWEEN(10,100) may return 47 if you keep trying 11. Convert pounds to KGs, meters to yards and tsps to table spoons You need not ask Google if you need to convert 156 lbs to kilograms or find out how much 12 tea spoons of olive oil actually means. The hidden convert() function is really versatile and can convert many things to so many other things, except one currency to another, of course. Example: Use CONVERT(150,"lbm","kg") to convert 150 lbs to 68.03 kgs. Use CONVERT(12,"tsp","oz") to findout that 12 tsps is actually 2 ounces. 12. Instantly calculate loan installments using spreadsheet formula You have your eyes on that beautiful car or beach property, but before visiting the seller / banker to findout of the monthly payment details, you would like to see how much your monthly / biweekly loan payments would be. Thankfully excel has the right formula to divide an amount to equal payment installments over given time period, the pmt() function. 95 Excel Tips to Make you awesome 14 http://chandoo.org/wp/
  • 15.
    If your loanamount is $125,000, APR (interest rate per year) is 6%, loan tenure is 5 years and payments are made every month, then, Use PMT(6%/12,5*12,-125000) which tells us that monthly payment is $ 2,416 if you keep trying Also, if you want to find out how much of each payment is going for principle and how much for the interest component, try using ppmt() and ipmt() functions. As you can guess, even though EMIs or loan installments remain constant, the amount contributed to principle and interest vary each month. 13. What is this week’s number in the current year? Often you may need to find out if the current week is 25th week of this year. This is not so difficult to find as it may seem. Again, excel has the right function to do just that. Example: Use WEEKNUM(TODAY()) will get 33 14. Find out what is the date after 30 working days from today? Finding out a future date after 30 days from today is easy, just change the month. But what if you need to know the date thirty working days from now. Don’t use your fingers to do that counting, save them for typing a comment here and use the workday() excel function instead. Example: Use WORKDAY(TODAY(),30) tells that Sep 24, 2008 is 30 working days away from today. If you want to find out number of working days between 2 dates you can use networkdays() function, find out this and a 14 other fun things you can do with excel. 15. With so many functions, how to handle errors Once you get to the powerful domain of excel functions to simplify your work, you are bound to have incorrect data, missing cells etc. that can make your formulas go kaput. If only there is a way to find out when a formula throws up error, you can handle it. Well, you know what, there is a way to find out if a cell has an error or a proper value. iserror() MS Excel function tells you when a cell has error. Example: Use ISERROR(43/0) returns TRUE since 43 divided by zero throws divide by zero error. 95 Excel Tips to Make you awesome 15 http://chandoo.org/wp/
  • 16.
    Also try ISNA()to find out if a cell has NA error (Not applicable). Give these functions a try, simplify your work and enjoy More: Advanced Formula Examples & Explanations 95 Excel Tips to Make you awesome 16 http://chandoo.org/wp/
  • 17.
    15 Ways toHave Fun with Excel Who said Excel takes lot of time / steps do something? Here is a list of 15 incredibly fun things you can do to your spreadsheets and each takes no more than 5 seconds to do. 1. Change the shape / color of cell comments Just select the cell comment, go to draw menu in bottom left corner of the screen, and choose change auto shape option, select a 32 pointed star or heart symbol or a smiley face, just wow everyone 2. Filter unique items from a list Select the data, go to data > filter > advanced filter and check the “unique items” option. 95 Excel Tips to Make you awesome 17 http://chandoo.org/wp/
  • 18.
    3. Sort fromLeft to Right What if your data flows from left to right instead of top to bottom? Just change the sort orientation from “sort options” in the data > sort menu. 4. Hide the grid lines from your sheets Go to Options dialog in tools menu, uncheck the “grid lines” option to remove gridlines from your worksheets. You can also change the color of grid line from here (not recommended) 5. Add rounded border to your charts, make them look smooth 95 Excel Tips to Make you awesome 18 http://chandoo.org/wp/
  • 19.
    Just right clickon the chart, select format chart option, in the dialog, check the “rounded borders”. You can even add a shadow effect from here. 6. Fetch live stock quotes / company research with one click Just enter the stock symbol (MSFT, GOOG, AAPL etc.) in a cell, alt+click on the cell to launch “research pane”, select stock quotes to see MSN Money quotes for the selected symbol. You can fetch company profiles in the same way. Learn more. 7. Repeat rows on top when printing, show table headers on every page When you are on the sheet view, just hit menu > file > page setup, go to the last tab, specify “rows to repeat”. You can “repeat columns while printing” as well from the same menu. 8. Remove conditional formatting / all formatting with one click 95 Excel Tips to Make you awesome 19 http://chandoo.org/wp/
  • 20.
    Just go toMenu > Edit > Clear > All to remove all the formatting from selected cell / range. 9. Auto sum cells with one click Select a bunch of cells and click on the Sigma symbol on the standard tool bar. Alternatively you can use Alt+= keyboard shortcut. 10. Find width of a column with formula, really! Just use =cell("width") to find the width of the column to which that formula cell belongs. Width is returned as the nearest integer. 11. Find total working days between any two dates, including holidays 95 Excel Tips to Make you awesome 20 http://chandoo.org/wp/
  • 21.
    If you workon project plans, gantt charts alot, this can be totally handy. Just type =networkdays(start date, end date, list of holidays) to fetch the number of working days. In the above sample you can see the number of working days between New years day and September first of this year (labor day). 12. Freeze Rows / Columns in your sheet, Show important info even when scrolling Select the cell diagonally beneath the row / columns you want to freeze (for eg. if you wan to freeze row 1&2 and columns A&B, click in C3), go to menu > window and click on freeze panes. 13. Split sheets in to two, compare side by side to be more productive Just click on this little vertical bar on the bottom right corner of the sheet (see below) and drag it to create a vertical split. You can do the same way for a horizontal split as well 95 Excel Tips to Make you awesome 21 http://chandoo.org/wp/
  • 22.
    14. Change thecolor of various sheet name tabs Right click on sheet and select “Tab color” option to change the worksheet tab colors. Group them with similar colors if you have lot of sheets, it looks nice. 15. Insert a quick organization chart Click on menu > insert > diagram to open the above dialog, just select the organization chart option, enter node values and you have a pretty organization chart. Alternatively learn how to create org charts in excel. 95 Excel Tips to Make you awesome 22 http://chandoo.org/wp/
  • 23.
    Know How toPaste Your Data – 7 Tricks 1. Paste Formats (or Format painter) Like that sleek table format your colleague has made? But don’t have the time to redo it yourself, worry not, you can paste formatting (including any conditional formats) from any copied cells to new cells, just hit ALT+E S T. 2. Paste Formulas If you want to copy a bunch of formulas to a new range of cells - this is very useful. Just copy the cells containing the formulas, hit ALT+E S F. You can achieve the same effect by dragging the formula cell to new range if the new range is adjacent. 3. Paste Validations Love copy those input validations you have created but not the cell contents or anything, just press ALT+E S N. This is very useful when you created a form and would like to replicate some of the cells to another area. 4. Adjust column widths of some cells based on other cells You have created a table for tracking purchases and your boss liked it. So he wanted you to create another table to track sales and you want to maintain the column widths in the new table. You dont have to move back and forth looking for column widths or anything. Instead just paste column widths from your selection. Use ALT+E S W. 5. Grab comments only and paste them elsewhere If you want to copy comments alone from certain cells to a new set of cells, just use ALT + E S C. This will reduce the amount of retyping you need to do. 95 Excel Tips to Make you awesome 23 http://chandoo.org/wp/
  • 24.
    6. Add whilepasting For example, if you have in Row 1 - 1 2 3 as values and in Row 2 - 7 8 9 as values and you would like to add row 1 values to row 2 values to get - 8 10 12, you can do this using paste special. Just copy row 1 values and use ALT + E S D. 7. Paste links to other cells If you want to create references to a bulk of cells instead of copy-pasting all the values this is the option for you. Just use ALT+E S L to create an automatic reference to copied range of cells. 95 Excel Tips to Make you awesome 24 http://chandoo.org/wp/
  • 25.
    Want to learnmore? Consider joining our Excel training programs Become awesome in Excel & Dashboards with online classes from Chandoo.org. Use VBA & Macros like a pro by joining our online training program. Click here to know more Click here to know more 95 Excel Tips to Make you awesome 25 http://chandoo.org/wp/
  • 26.
    STEAL THIS BOOK! Grabthe chance to steal this book. Here is what you can do to spread this book. 1. Send the file to a colleague or friend. 2. Send them a link to http://chandoo.org/wp/subscribe so that they can download it. 3. Print out as many copies as you like. 95 Excel Tips to Make you awesome 26 http://chandoo.org/wp/
  • 27.
    something Thank you forreading 95 Excel Tips & Tricks For more tips, visit 95 Excel Tips to Make you awesome 27 http://chandoo.org/wp/