From the course: PLC Simulation Software: Factory I/O with Connected Component Workbench
Unlock the full course today
Join today to access over 24,900 courses taught by industry experts.
Filling a water tank project - Ladder Logic Tutorial
From the course: PLC Simulation Software: Factory I/O with Connected Component Workbench
Filling a water tank project
- [Narrator] This project includes using the scene from Factory IO to fill an empty tank, using a timer. I have provided you with the scene file. You can find it in chapter five folder. For this project, I'm going to write a latter logic program following these steps. When pressing on the fill push button, a timer starts and the fill valve is open for 15 seconds. The time is showing on the display. When the time is done, the fill valve closes. Then, when we press on the discharge push button, the discharge valve is activated, releasing the water out of the tank. This is a demonstration of the project showing the valves, the tank, and the Control Panel in the Factory IO scene. And, also, I'm using a PLC simulator from Connected Components Workbench software. Here is a list of the inputs and outputs for this project. You can also see them in Factory IO by going to File and Drivers. And here's a list of the inputs and…
Practice while you learn with exercise files
Download the files the instructor uses to teach the course. Follow along and learn by watching, listening and practicing.
Contents
-
-
-
-
-
-
-
(Locked)
Filling a water tank project3m 14s
-
(Locked)
Step 1: Program fill and discharge pushbuttons3m 16s
-
(Locked)
Step 2: Adding timer (TON) in CCW software5m 28s
-
(Locked)
Step 3, part 1: Showing time on display in Factory I/O3m 34s
-
(Locked)
Project demo 11m 26s
-
(Locked)
Step 3, part 2: Showing time on display in Factory I/O9m 35s
-
(Locked)
Final project demo1m 51s
-
(Locked)
-
-
-